What the regulation requires

Regulation 298 sets hydraulic test pressures as multiples of the design pressure. It has no single formula; the multipliers are summarised below, with the factors copied exactly and the surrounding wording shortened (see the Official text tab for the full wording):

(1)(a) sub-critical boiler, after erection at site:  1.25 times the design pressure
(1)(a) Super critical boiler: not less than 1.5 times the design pressure at the super heater outlet
       but not less than 1.25 times the design pressure of any part of the boiler
(1)(b) components not tested hydraulically as per regulation 167: 1.5 times the design pressure
(1)(d) the pressure never exceeds by more than 6% of the required pressure; held for 30 minutes
(1)(e) components for renovation or retrofit or spares, at site: 1.25 times of the design pressure
(5)(b) maximum allowable working pressure for the part = 40 per cent of the test pressure
       applied when the point of permanent set was reached
(6)    subsequent examination: 1.25 times the design pressure
(7)    Competent Person cannot get inside: 1.5 times the design pressure

Symbols and units

Regulation 298 uses "design pressure", "required pressure", "test pressure" and "maximum allowable working pressure" without printing a unit. The multipliers are pure numbers, so the results are in whatever unit the design pressure is given in. The example below uses kg/cm2 for illustration. Test water temperature is in °C (298(1)(c)).

Worked example

Example values (hypothetical, not from the regulation).

Sub-critical boiler, design pressure 65 kg/cm2:

  1. Site test after erection, 298(1)(a): 1.25 × 65 = 81.25 kg/cm2
  2. Never to exceed, 298(1)(d): 81.25 + 6% = 1.06 × 81.25 = 86.125 kg/cm2, i.e. 86.13 kg/cm2 (2 decimal places)
  3. If all components were not tested as per regulation 167, 298(1)(b): 1.5 × 65 = 97.5 kg/cm2, never to exceed 1.06 × 97.5 = 103.35 kg/cm2
  4. Subsequent examination, 298(6): 1.25 × 65 = 81.25 kg/cm2

Super critical boiler, design pressure at the super heater outlet 250 kg/cm2, highest design pressure of any part 320 kg/cm2:

  1. 1.5 × 250 = 375 kg/cm2
  2. 1.25 × 320 = 400 kg/cm2
  3. The test pressure must be not less than both, so not less than 400 kg/cm2.
  4. Never to exceed, 298(1)(d): 1.06 × 400 = 424 kg/cm2

Permanent set, 298(5)(b): if a part showed permanent set when the test pressure applied was 90 kg/cm2 (example value), the maximum allowable working pressure for that part is 40% × 90 = 36 kg/cm2.

Checks and limits

  • 298(1)(a) is subject to the provisions of sub-regulation (1) of regulation 300.
  • Test water temperature not less than 20°C and not greater than 50°C (298(1)(c)).
  • The pressure is raised gradually under proper control and maintained for 30 minutes, then reduced to the maximum allowable working pressure for close visual inspection (298(1)(d)). The boiler must withstand the pressure without appreciable leakage or undue deflection or distortion for at least ten consecutive minutes (298(2)).
  • 298(11): in minor repairs to water tube boilers where non-destructive testing has been carried out by an approved method, the hydraulic test may be dispensed with.
  • The example does not decide which situation applies to a particular boiler, and does not cover deflection measurements (298(3)) or the conditions in 298(8) to (12).

Educational example only. Not a design calculation; verify against the official Gazette and applicable requirements.

Calculator