Indian Boiler Regulations, 2026 · Chapter 15 · Feed Water for Boiler
Regulation 558. Sampling
Not yet checked against the official Gazette; verify before relying on it.
558. Sampling.─ Sampling shall be done by following general directions mentioned in Part-2 of IS: 3025 issued by Bureau of Indian Standards and in particular, the following points shall be observed, namely:-
(a)A stainless steel or monel metal coil shall be fitted on the sampling cock so that the temperature of the water sample shall be well below the boiling point at atmospheric pressure and there is no risk of aeration and concentration due to flashing into steam; and
(b)Samples of feed water shall be collected from the delivery of the boiler feed pump, samples of boiler water from the top drum, and samples of condensate from the delivery of the condensate extraction pump.
In short
Water samples are taken following the general directions in Part-2 of IS: 3025 issued by the Bureau of Indian Standards, plus two specific points on cooling and sampling locations.
Key points
- (a) A stainless steel or monel metal coil is fitted on the sampling cock. It keeps the sample temperature well below boiling point at atmospheric pressure, so there is no risk of aeration and concentration from flashing into steam.
- (b) Sampling points:
- feed water: from the delivery of the boiler feed pump;
- boiler water: from the top drum;
- condensate: from the delivery of the condensate extraction pump.
Written by IBRsource editors · last edited 2026-11-20. Explanations simplify and are not a design method, testing procedure or authorisation. Requirements come from the complete regulations, the Gazette and approved documentation.
Comparison pending: the IBR 1950 text in force on 30 September 2026 is not yet established for this provision, so no change is claimed (how this works).
Orientation hints (unverified)
These candidates come from automated heading matching against DPIIT's scanned historical print edition of IBR 1950. That edition uses imperial units and riveted-construction provisions, so it is not the operative 2026 predecessor text. Regulation numbers alone never prove equivalence.
No candidate heading found in the historical print edition.
Images of the official Gazette pages that contain this regulation. Click to zoom. Compare word by word before relying on the extracted text.

Indian Boiler Regulations, 2026, reg. 558, Regulation 558, Gazette of India, Extraordinary, Part III—Section 4, No. 596, 1 October 2026, printed p.859. https://egazette.gov.in/WriteReadData/2026/276813.pdf (text consulted via IBRsource, 2026-11-23).
The citation refers to the government publication. Cite the Gazette, not this website.