Appendix K — Time limits for the various activities

Official text — not yet verifiedGazette p.995–997

Not yet checked against the official Gazette; verify before relying on it.

Open the official Gazette at this appendix

Official text · verification status above
             APPENDIX- K
Time limits for the various activities
Sl. No.ActivityRegulation/ Provision in IBRTime limitAuthority /Person
(1)(2)(3)(4)(5)
1.Issue
of
Certificate
for
manufacture and test in Form-
I(Part-B) and Form- I(Part-C)
8(a)(i) 3 days for boiler
components.
(ii)
7 days for boiler
Inspecting Authority
2.Issue of Inspecting Authority
Certificate during erection in
“Form-I(Part-E) ”
8(a)(v)2 daysInspecting Authority
3.Steam Tests of boiler299(1)30 daysInspector
4.Issue of provisional order in Form-
X after registration inspection
300(2)48 HoursInspector
5.Assigning of Registration No. for
boilers
30030 daysChief Inspector of
Boilers
6.Transfer
of
Memorandum
of
Inspection Book & Registration
Book
30915 daysChief Inspector of
Boilers
7.Issue of Certificate for use of boiler
in Form-XII
31048 HoursCompetent Person
8.Submission
of
Remnant
Life
Assessment
report/
recommendations
313 to 31530 days from date of
completion
of
inspection/tests
Well Known
Remnant Life
Assessment
Organisation
9.Recognition of repairers boilers &
steam pipes
316(5)30 daysChief Inspector of
Boilers
10.Permission
to
carry
out
repairs/alterations in boilers
316(3)(e)(ii)2 daysChief Inspector of
Boilers
11Approval
of
design
and
manufacturing
drawings
for
boilers and boiler components
made in India
321(1)(i) 5 days for boilers
components & boilers
upto 20 TPH
capacity.
(ii) 15 days for boilers
above 20 TPH &upto
100 TPH capacity
(iii) 21 days for boilers
above
100
TPH
capacity
Inspecting Authority
12.Approval of materials for boilers
and boiler components made
outside India
321(3)(i) 5 days, in case of same
materials as previously
approved for the same
design
pressure
&
temperature
(ii) 10 days, in other cases
Technical
Adviser(Boilers)
13.Approval
of
design
and
manufacturing
drawings
for
boilers and boiler components
made outside India
321(3)21 daysChief Inspector of
Boilers
14,Issue of Welder qualification
certificate in Form-II after
submission of satisfactory reports
5415 daysCompetent Authority
15.Inspection during construction/
manufacture
Appendix-A2 daysInspecting Authority/
Competent Person

Table structure read from the Gazette PDF, pages 995, 996. Verification status as for the text above.

Show original extracted text (diagnostic, not authoritative)
Sl.                Activity                   Regulation/             Time limit         Authority /Person
                                              Provision in                                        (5)
No.                                                                        (4)
                                                  IBR       (i) 3 days for boiler       Inspecting Authority
(1)                 (2)                            (3)
                                                  8(a)           components.            Inspecting Authority
1. Issue of Certificate for                                 (ii) 7 days for boiler            Inspector
                                                                                              Inspector
     manufacture and test in Form-

     I(Part-B) and Form- I(Part-C)

2. Issue of Inspecting Authority              8(a)(v)       2 days
       Certificate during erection in         299(1)        30 days
       “Form-I(Part-E) ”

3. Steam Tests of boiler

4. Issue of provisional order in Form-        300(2)        48 Hours
       X after registration inspection

5. Assigning of Registration No. for          300           30 days                     Chief Inspector of
                                                                                              Boilers
     boilers

6. Transfer of Memorandum of                  309           15 days                     Chief Inspector of
                                                            48 Hours                          Boilers
     Inspection Book & Registration
                                                                                        Competent Person
     Book

7. Issue of Certificate for use of boiler     310

     in Form-XII

8. Submission of Remnant Life                 313 to 315    30 days from date of           Well Known
                                                316(5)                                    Remnant Life
     Assessment                      report/                completion              of     Assessment
                                                                                           Organisation
     recommendations                                        inspection/tests            Chief Inspector of

9. Recognition of repairers boilers &                       30 days                           Boilers
       steam pipes

10. Permission to carry out 316(3)(e)(ii)                   2 days                      Chief Inspector of

     repairs/alterations in boilers                                                     Boilers

11 Approval of design                and      321(1)        (i) 5 days for boilers      Inspecting Authority

     manufacturing drawings for                             components & boilers

     boilers and boiler components                          upto              20 TPH

     made in India                                          capacity.

                                                            (ii) 15 days for boilers

                                                            above 20 TPH &upto

                                                            100 TPH capacity

                                                            (iii) 21 days for boilers

                                                            above 100 TPH

                                                            capacity


12. Approval of materials for boilers    321(3)       (i) 5 days, in case of same        Technical
        and boiler components made       321(3)      materials as previously        Adviser(Boilers)
        outside India                                approved for the same
                                                     design pressure &              Chief Inspector of
13. Approval of design   and                         temperature                          Boilers
                                                      (ii) 10 days, in other cases

21 days manufacturing drawings for boilers and boiler components made outside India

Original extracted text of the table above, continued (diagnostic)
14, Issue of Welder qualification        541         5 days                         Competent Authority

certificate in Form-II after submission of satisfactory reports

Original extracted text of the table above, continued (diagnostic)
15. Inspection during construction/      Appendix-A  2 days                         Inspecting Authority/
                                                                                     Competent Person

manufacture

Note: (1) Above time limits shall be applicable from the date of submission of complete details/documents.

(2)After expiry of prescribed time limits for an activity, approval for that activity shall be deemed to have been granted.