A. Power Utility Boilers working at a pressure 100 kg/cm2(g) or more and upto 100,000 hours of operations.─
(1)The boilers working at a pressure 100 kg/cm2(g) or more and up to 100,000 of operations, generating steam for power generation shall be inspected as detailed below after the expiry of twelve months from the date of inspection carried out in accordance with the procedure provided in regulation 311 and certification of fitness shall be issued by the concerned Competent Person in the State, through inspection of the following records which shall be made available to the concerned Competent Person at least thirty days before the expiry of the operating certificate, provided he is satisfied that the boiler can be allowed to be operated for a further period of twelve months.
(a)Operation data for superheater and reheater temperature excursions from the output of Data Acquisition System (DAS).
(b)History of shut downs during the previous year with their causes and actions taken.
(c)Records of any Non-Destructive test carried out on the boiler pressure parts during the year.
(d)Water quality to the boiler is maintained up to the requirement of such boilers and on line data of the quality be provided.
(e)Boiler tube failure record (location, number of tubes repaired/replaced).
(2)Inspection shall be carried out by the concerned Competent Person at the expiry of twenty-four months as provided in regulation 311. However, in case shutdown of fifteen days or more is planned any time before expiry of the certification period and after six months of the certification, the Competent Person shall be duly informed so that complete inspection can be scheduled during the said shut down period.
B. Power boiler working at a pressure up to 100 kg/cm2(g) and up to 100,000 hours of operations or 25 years of operations as applicable. ─
(1)The boilers working at a pressure up to 100 kg/cm2(g)and up to 100,000 hours of operations for boiler operating above 400°C and 25 years of operation for boilers operating less than 400°C generating steam for power generation shall at the expiry of twelve months from the date of inspection carried out in accordance with the procedure provided in regulation 311 and certification of fitness by the concerned Competent Person in the State, and having satisfied with the operation records at paragraph ‘A’, shall be allowed for running for another period of twelve months.
(2)Inspection shall be carried out by concerned Competent Person at the expiry of twenty-four months as provided in regulation 311. However, if shutdown of fifteen days or more any time before expiry of the certification period and after six months of the certification, Competent Person shall be duly informed so that inspection can be scheduled during the said shut down period.
C. Boilers working at a pressure 100 kg/cm2(g) or more, and more than 100,000 hours of operations. ─
(1)Boiler working at a pressure 100 kg/cm2(g)and more than 100,000 hours of operations, generating steam for power generation, shall continue to be subject to inspection as provided in regulation 311every year to the satisfaction of concerned Competent Person in States. However, if Remnant Life Assessment (RLA), as per provisions in these regulations is carried out on the boiler and if found satisfactory, then procedure as per paragraph “A” above shall be applicable.
(2)Inspection shall be carried out by the concerned Competent Person at the expiry of twenty-four months as provided in regulation 311. However, if shut down of fifteen days or more any time before expiry of the certification period and after six months of the certification, Competent Person shall be duly informed so that inspection can be scheduled during the said shut down period.
D. Boiler working at a pressure up to 100 kg/cm2(g) and more than 100,000 hours of operations or twenty-five years of operations as applicable. ─
1) Boiler working at a pressure up to 100 kg/cm2(g) and more than 100,000 hours of operations for boiler operating above 400°C and twenty-five years of operation for boilers operating less than 400°C, shall continue to be subjected to inspection every year as provided in regulation 311. However, if Remnant Life Assessment (RLA), as per provisions in these regulations is carried out on the boiler and if found satisfactory, then procedure as per paragraph “B” above shall be applicable.
2) Inspection shall be carried out by the concerned Competent Person at the expiry of twenty-four months as provided in regulation 311. However, in case of shut down of fifteen days or more any time before expiry of the certification period and after six months of the certification, Competent Person shall be duly informed so that inspection can be scheduled during the said shut down period.