BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)

Regulation 50 — Additional tests before rejection

Unofficial DPIIT web edition · not verified1 amendment found

Text in the DPIIT web edition

Archived copy captured 03 Aug 2022 (Wayback Machine). This page was revised after the 2019 capture, so later amendments may be included. Units as printed.

Unofficial DPIIT web edition · archived 2022 · not checked against the Gazette
  [image] [image]


Message from
Chairman of Central Boilers Board
•
About Central Boilers
Board
•
History of Indian Boiler Regulations
•
Foreword
•
Contents Chapter
Wise
•
Contents Regulation
Wise
•
List of Amendments
•
Indian Boilers
Act 1923
•
Ibr Forms
•
Home
•
Search
•
Help
•
Contact Us

[image]

[image]
Reg. 50
MATERIALS OF CONSTRUCTION

SEAMLESS FERRITIC AND AUSTENITIC ALLOY STEEL BOILER, SUPERHEATER AND HEAT EXCHANGER TUBES

Additional tests before rejection


(i)If any one or more tests specified in these regulations fail, two further tests of the same kind may be made on two other tubes of the same batch.  If any of these tests fails, the batch of the tubes represented may be given a further heat treatment and entire set of tests shall be repeated.

(ii)  If the repeat tests are satisfactory the tubes shall be accepted.  If any failure in the tests should occur the entire batch of the tubes shall be rejected.

[image] [image]
[image] [image] [image]
Message from Chairman of Central Boilers Board • About Central Boiler Board • History of Indian Boiler Regulations • Foreword • Contents Chapter Wise • Contents Regulation Wise • List of Amendments
• Indian Boilers Act 1923 • Ibr Forms • Home • Search • Help • Contact Us
Earlier text: the 2008 DIPP web edition

MATERIALS OF CONSTRUCTION

SEAMLESS MOLYBDENUM STEEL BOILER AND SUPERHEATER TUBES FOR DESIGN METAL TEMPERATURES NOT EXCEEDING 510 DEGREE C (950 DEGREE F).

Additional tests before rejection

Should a tube selected for testing purpose show definite signs of failure in any one or more of the tests specified in Regulations 49(a), 49(b) and 49(c), two further tests of the same kind may be made at the option of the manufacturer from two additional tubes selected from the same batch. If the repeat tests are satisfactory the tubes shall be accepted provided that in all other respects they fulfill the conditions of this standard. Should either of the tubes fail in any tests, the batch of tubes represented may be re-heat-treated in accordance with Regulation 48

(b)and then retested in accordance with Regulations 49(a), 49(b) and 49(c), but employing twice the number of test pieces. If these second repeat tests are satisfactory, the tubes shall be accepted provided that in all other respects they fulfill the conditions of this standard; but if definite defects are again shown, the batch of tubes which the test pieces represent shall be rejected.

Amendments found

Machine-assisted list from the amending notifications (DPIIT copies; 1990–1998 from scanned Gazette issues on India Code); may be incomplete.

DateNotificationPartActionWhat changed (summary)Web edition
2001-04-10G.S.R. 219SubstitutedReplaced as part of the block substitution of regulations 36 to 56 (tube specifications).listed before the capture