IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)

Regulation 331 — FUSIBLE PLUGS

Unofficial DPIIT web edition · not verified3 amendments found

Text in the DPIIT web edition

Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulations 330, 332, 333. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.

Unofficial DPIIT web edition · archived 2022 · not checked against the Gazette

Reg. 330, Reg. 331, Reg. 332, Reg. 333

Test Connections-Inspector’s Pressure Gauge Attachment


Every boiler shall be fitted with a valve or cock carrying in a vertical position a receiving screw for attachment of the Inspector’s pressure gauge. The receiving socket shall be tapped for M20 x 1.5 metric threads and shall be fitted with an easily removable cap.


Reg. 331
FUSIBLE PLUGS

General

1) Fusible plugs shall be of sufficient height and fitted in such a position as to give early protection to all parts of the boiler liable to damage by the direct application of furnace heat in the event of shortness of water.
2) On boilers having wet back reversing chamber, a minimum of two fusible plugs shall be fitted; one on the crown of the reversing chamber and the other on one of the tube plates. On boilers not having Wet back reversing chamber, at least one fusible plug shall be provided on the front end tube plate. The plug shall be fitted in such a way that in the event of fusion of the plug, the pressure inside the boiler shall push the pellets out.

Note: - For example : In Lancashire Boilers the fusible plugs should be in the crowns of the furnaces from 12 inches to 18 inches in front of the brickwork fire bridge.


Reg. 332

Type

Fusible plugs shall consist of an outer body with a central conical passage the smallest part to be not greater than 1/2 inch for plugs suitable for pressure up to 100 lbs. per sq. in. and not greater than 3/8 inch for plugs for pressures exceeding 100 lbs. per sq. in. The passage shall be closed by a plug secured by an annual lining of fusible alloy so that the plug may drop clear if the lining melts.

The portion of the body carrying the fusible metal should preferably be detachable from the base to allow of easy replacement without removing the whole fitting from the boiler.


Reg. 333

Material

The non-fusible portions of the plug shall be of bronze except where the nature of the boiler water precludes the use of a non-ferrous material. The fusible metal shall be an alloy melting readily at a temperature not less than 150º F in excess of the saturated steam temperature at the maximum permissible working pressure of the boiler.
Earlier text: the 2008 DIPP web edition

FUSIBLE PLUGS

General

1)Fusible plugs shall be of sufficient height and fitted in such a position as to give early protection to all parts of the boiler liable to damage by the direct application of furnace heat in the event of shortness of water.

2)On boilers having wet back reversing chamber, a minimum of two fusible plugs shall be fitted; one on the crown of the reversing chamber and the other on one of the tube plates. On boilers not having Wet back reversing chamber, at least one fusible plug shall be provided on the front end tube plate. The plug shall be fitted in such a way that in the event of fusion of the plug, the pressure inside the boiler shall push the pellets out.

Note: - For example : In Lancashire Boilers the fusible plugs should be in the crowns of the furnaces from 12 inches to 18 inches in front of the brickwork fire bridge.

Amendments found

Machine-assisted list from the amending notifications (DPIIT copies; 1990–1998 from scanned Gazette issues on India Code); may be incomplete.

DateNotificationPartActionWhat changed (summary)Web edition
1994-10-01compilation-1987-1998#p28 OCR of compilation(1), (2)RenumberedNumbers the regulation as (1) and inserts (2) on the number and location of fusible plugs.listed before the capture
1994-10-31G.S.R. 562 OCR of scanRenumberedRenumbers regulation 331 as sub-regulation (1) thereof.listed before the capture
1994-10-31G.S.R. 562 OCR of scan(2)InsertedInserts sub-regulation (2): two fusible plugs on wet-back reversing-chamber boilers, at least one on front tube plate otherwise, fitted so pressure pushes pellets out.listed before the capture