Indian Boiler (Fifth Amendment) Regulations, 1994 (G.S.R. 562)
Amends IBR 1950 regulations 331, 347, 546 and 547: renumbers 331 as 331(1) and inserts 331(2) on fusible plugs for wet-back and other boilers, lowers the sulphur and phosphorus maxima in regulation 347 Table I to 0.05, and ties stress relieving in 546 and 547(a) to regulation 562. A clause 4 also inserts a new Figure 365/29A, but its heading is lost in the OCR.
Scanned weekly Gazette of India (Part II, Section 3(i)) of 12th November, 1994, as hosted by India Code and archived by the Wayback Machine (capture 2023-11-23). The scan also contains other notifications; only the Central Boilers Board notification is reproduced here. Reader's note: Text is in two interleaved columns on pages 4-5. Clause 4 (inserting Figure 365/29A and apparently other figure items; see stray labels 'FIGURE 35/21', 'WELD DETAILS ADDED WITH REFERENCE TO FIG. 23-D') is largely lost in figure OCR; only '(ii) after figure No. 365/29 ...' survives. Draft was GSR 180 dated 25 March 1994 (Gazette 16 April 1994, pp. 591-595). File No. 6(20)/93-Boilers; signed V. K. Goel, Secy. Footnote lists amendments up to GSR 427 dated 20 Aug 1994.
Gazette scan (India Code copy, archived). Regulation numbers below refer to the IBR 1950, not the IBR 2026.
IBR 1950 regulation numbers appearing in the notification (includes incidental references; verification pending): 331, 347, 546, 547, 562
Not yet checked against the official notification (read from a scan by OCR); verify before relying on it.
MINISTRY OF INDUSTRY
(Department of Industrial Development)
Central Boilers Board
New Delhi, the 31st October, 1994
G.S.R. 562 —Whereas a di aft of certain regulations further
to amend the Indian Boiler Regulations, 1950 were published
as required by sub-section (1) of Section 31 of the Indian
Boilers Act, 1923 (5 of 1923), at paces 591 to 595 of tho
Gazette of India, Part IT, Section 3. Sub-section (I), dated
the 16th April, 1994 under the notification of the Govern-
metut of India in the Ministry of Industry (Department of
Industrial Development) (Central Boilers Board) number GSR
180 dated the 25th March, 1994 iniviting objections and
suggestions from all persons likely to be affected thereby
before tht expiry of forty-five days from the date on which
copies of the Official Gazette containing the said notification were made available to the public
And whereas the said Gazette was made available to the
public on the 11th May, 1994
And whereas rio objections or suggestions have been received
from the public in respect of the said draft by the Central
Boilers Board
Now, therefore, in exercise of the powers confrzed by
Section 28 of the Indian Boilers Act, 1923 (5 of 1923). the
Central Boilers Eloard hereby makes the following regulations
further to amend the Indian Boiler Regulations, 1950,
namely
1. (1) These regulations may be called the Indian Boiler
(Fifth Amendment) Regulations, 1994.
1870 THE GAZETTE OF INDIA NOVEMBER 12, 1Q4/KARTIKA 21, 1916
[P.tK -r 11--Si-,c. 3(i
(2)They shall come into force on the date of their (ii) after sub-regulation (1), as so re-numbered and the publication in the Official Gazette.
Note' thereunder, the following sub-regulation siall
2. In the Indian Boiler Regulations, 1950
(hereinafter
be inserted, namely referred as the sajd Regulations,—
(2)On boilers having wet back revel sing chamber, a
(i)regulation 331 shall be renumbered as sub-regulation
minimum of two fusible plugQ shall he fltcd one
(1)thereof
on the ctown of the reversing chamber and the
tWJj- WELD CCTMLS ADDED
WI1H REFERENCE 10 ?N0. 23-1).
FIGURE 35/2.1
I i
UJS TH$OI
00 F..A11 DMC*
FIGURE 35fq..
Tr-
I - 01Z4I IHICNCS
FIGURE
355/17
FIGURE
[rrqfl__..iga(i)]
1871
otbpr o,p one of the tube plates. On boilers not (si) after fignie No. 365/29, th.c following new figure shall having Wet back reversing chamber, at least one
be inserted, namely
fusible plug shall be provided on the front end
tube plate, The plug shall be fitted in such a wey
(Figure 365 /29A, to be punted on page No, 1870.)
that in the event of fusion of the plug, the pressure
inside the boiler shall push the pellets out,".
5. In the said regulations, in regulation 546, in sub-regula-
tion (i), after the words 'completion of all welding" occurring
3. lii the said regulations, in regulation 347 in Table I,
at the end, the following shalt be added namely
under column headings "Sulphur per cent max. "and" Phos-
phores per cent max. "respectively for the entry "0Q6", tl in accordance with regulation 562". entry "0.05" shall be substituted,
6. In the said regulations, in reguiauon j,, in sio-ci-
tion (a), in the opening paragraph, for the words "The welding shall he stress-relieved", the following shall be substituted, namely
The s elding shall be stress-relieved in accordance with
regulation 562".
[File No. 6(20),93-Boiler0
V. K. GOEL, Secy.
Foot flute --The principal regulations were published in the
Gazette of India as S.R.O, No. 600 dated 15ih
,September, 1950 and last amended vidc Gazette
noti.lications
(i)GSR 178 dated 24th
March,
1990
(iii)GSR 179 dated
24th March,
1990
)ii) GSR 488 dated 9th October,
1993
(iv)GSR 516 dated 23rd October,
1993
(v)GSR 634 dated 25th
December,
1993
( i) GSR
107 dated 26th February,
1994
(Corrigendum GSR 223 dated 14th May,
1994)
(vii)GSR 250 dated
4th
June.
1994
(viii)(iSR 402 dated
12th August.
1994
(ix)GSR 427 dated 20th August,
1994.