Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 247 — FUSION WELDED DRUMS
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulations 246, 248, 249. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
|
| ||||||||
Reg. 247
Reg. 248
Reg. 249
| ||||||||
Earlier text: the 2008 DIPP web edition
FUSION WELDED DRUMS
Definition of term ‘Fusion Weld'
The term ‘Fusion Weld’ is, for the purpose of this Chapter, applicable to all welded joints made by the metal arc process with covered electrodes or other electric arc process in which the arc stream and the deposited weld metal are shielded from atmospheric contamination.
It is intended that this Chapter shall apply to the single run or heavy run welding process and that welded boiler drums manufactured by that process shall conform with all Regulations of this Chapter, excepting those in which divergence is necessary solely because of special requirements essential for the most efficient utilization of that process. Thus all Regulations governing quality of material, construction workmanship and testing (both non-destructive and otherwise) are applicable.
When welded drums ordered to this chapter are made by this single run or heavy run process it will be understood that Regulations 252 and 267 do not apply in their entirety.