BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)

Regulation 114 — Strengthening of Flat End Plate at Manhole

Unofficial DPIIT web edition · not verified0 amendments found

Text in the DPIIT web edition

Archived copy captured 03 Aug 2022 (Wayback Machine). The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.

Unofficial DPIIT web edition · archived 2022 · not checked against the Gazette
Reg. 114
END PLATES
Strengthening of Flat End Plate at Manhole

a) In the End Plates of Lancashire Boiler type, the mudhole in the lower part of the front end plate shall be fitted with a flanged riveted strengthening ring, the thickness of the flat portion of which shall be not less than (1.5T + 1/8 inch) where T equals the thickness of the end plate in inches.
b) In boilers 7 ft. 6 inches diameter and above, the mudhole frame shall be fitted with a peak to reinforce the portion of the end plate between and below the furnaces, and this peak shall be securely riveted thereto with rivets of similar pitch to the remainder of the frame.
c) In all cases the front end plate gusset stays below the furnaces shall be placed as closely as possible to the mudhole frame.
d) Where flat end plates are flanged for connection to the shell, the inside radius of flanging shall be not less than 1.75 times the plate thickness, with a minimum of 1½ inches.

Earlier text: the 2008 DIPP web edition

END PLATES

GENERAL

Strengthening of Flat End Plate at Manhole

a)In the End Plates of Lancashire Boiler type, the mudhole in the lower part of the front end plate shall be fitted with a flanged riveted strengthening ring, the thickness of the flat portion of which shall be not less than (1.5T + 1/8 inch) where T equals the thickness of the end plate in inches.

b)In boilers 7 ft. 6 inches diameter and above, the mudhole frame shall be fitted with a peak to reinforce the portion of the end plate between and below the furnaces, and this peak shall be securely riveted thereto with rivets of similar pitch to the remainder of the frame.

c)In all cases the front end plate gusset stays below the furnaces shall be placed as closely as possible to the mudhole frame.

d)Where flat end plates are flanged for connection to the shell, the inside radius of flanging shall be not less than 1.75 times the plate thickness, with a minimum of 1½ inches.

Possible IBR 2026 successors (heading match, unverified): Reg. 87, Reg. 481