BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Original IBRsource drawing · schematic (welding)

Welding test positions — plate and pipe

Schematic, not to scaleEducational — not an approved or fabrication-ready designTechnical review pending — not independently verified
Eight small sketches of plate and pipe coupons in the IBR welding positions with the weld bead highlighted, arrows showing the welding direction, a rotation arrow for the rolled pipe and no-rotation marks for fixed pipes.

Shows how a plate or pipe groove-weld test coupon is oriented in the IBR positions of regs. 510 and 512 (13/LGF, LGH, LGV, LGO; 13/PGR, PGV, PGH, PGI), with the common 1G–6G equivalents, to help readers follow the welder-qualification chapter.

Download

SVG — vector, for screens · PNG — image · PDF — print

Related provisions

Regulation 510 · Regulation 511 · Regulation 512 · Regulation 520 · Regulation 521 · Regulation 522

Basis
Schematic arrangement; no dimensions implied.
Units
—
Limitations
Schematic only; positions and sizes are illustrative.
Tool
Python SVG (svgkit) + headless Edge for PNG/PDF
Licence
CC BY 4.0 for this original drawing/model. Does not license the regulation text or Gazette figures.
Revision
v1.0 · 2026-11-20 · technical review: pending
File checksums
SHA-256 per file
  • SVG: 454d8a57891ee6f674aa0472af2d041718558cc419cbcf0648087cd320c2796e
  • PNG: 687c27790081fb34fcbd5f7566bfd439eaa97ed8fd2e7bb4fc11122d1f206c82
  • PDF: 1cfab763729b5f50fe10d233e0b6128eae4ab9d949d0528054561c94fb2d056b

The small IBRsource.com mark sits on its own layer (DXF) or group (SVG) and can be deleted. The CC BY 4.0 attribution requirement still applies if you remove it.

Educational drawing, not an approved or fabrication-ready design; verify against the Gazette (report a problem).