Regulation 63 — Number of tests

Unofficial DPIIT web edition · not verified2 amendments found

Text in the DPIIT web edition

Archived copy captured 03 Aug 2022 (Wayback Machine). The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.

Unofficial DPIIT web edition · archived 2022 · not checked against the Gazette
Reg. 63
MATERIALS OF CONSTRUCTION



Number of tests


(a) The test specified in regulations 59 and 60 shall be made on minimum 2 tubes for first 100 and 1 per 100 or part thereof for tubes over 100 number.

(b) If any test specimen shows defective machining or develops flaws, it may be discarded and another specimen substituted.

(c) If any one or more tests specified in these regulations fail, two further tests of the same kind may be made on two other tubes of the same batch.  If any of these tests fails, the batch of the tubes represented may be given a further heat treatment and entire set of tests shall be repeated.

If the repeat tests are satisfactory the tubes shall be accepted.  If any failure in the tests should occur the entire batch of the tubes shall be rejected.

 

Earlier text: the 2008 DIPP web edition

MATERIALS OF CONSTRUCTION

ELECTRICAL -RESISTR|ANCE -WELED STEEL BIOLER AND SUPER-HEATER TUBES FOR DESIGN METAL TEMPERATURES NOT EXCEEDING 454⁰ C (850⁰ F)

Number of tests

(a)The test specified in regulations 59 and 60 shall be made on minimum 2 tubes for first 100 and 1 per 100 or part thereof for tubes over 100 number.

(b)If any test specimen shows defective machining or develops flaws, it may be discarded and another specimen substituted.

(c)If any one or more tests specified in these regulations fail, two further tests of the same kind may be made on two other tubes of the same batch. If any of these tests fails, the batch of the tubes represented may be given a further heat treatment and entire set of tests shall be repeated.

If the repeat tests are satisfactory the tubes shall be accepted. If any failure in the tests should occur the entire batch of the tubes shall be rejected.

Amendments found

Machine-assisted list from the amending notifications (DPIIT copies; 1990–1998 from scanned Gazette issues on India Code); may be incomplete.

DateNotificationPartActionWhat changed (summary)Web edition
1969-03-01/1988-12-31compilation-1969-1988#p27 OCR of compilationRenumberedRenumbers regulation 63 as 63A.listed before the capture
1999-10-14G.S.R. 345SubstitutedReplaced as part of the block substitution of regulations 57 to 63A (electrically welded tubes).listed before the capture