Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 612 — Examination of Test Specimens for Requalification Tests
Text in the DPIIT web edition
Archived copy captured 05 Aug 2022 (Wayback Machine); the same page also prints regulations 613, 614. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
| Reg. 612, Reg. 613, Reg. 614 QUALIFICATION TESTS FOR WELDERS ENGAGED IN WELDING OF BOILERS AND STEAM-PIPES UNDER CONSTRUCTION, ERECTION AND FABRICATION AT SITE IN INDIA AND IN REPAIRING BOILERS AND STEAM-PIPES BY WELDING Reg 612 Examination of Test Specimens for Requalification Tests | |||||||||||
Reg. 613 Awarding of Marks
Reg. 614 Award of Certificate
|
Earlier text: the 2008 DIPP web edition
QUALIFICATION TESTS FOR WELDERS ENGAGED IN WELDING OF BOILERS AND STEAM-PIPES UNDER CONSTRUCTION, ERECTION AND FABRICATION AT SITE IN INDIA AND IN REPAIRING BOILERS AND STEAM-PIPES BY WELDING
Examination of Test Specimens for Requalification Tests
(a)Groove welded plate specimens
The welded joint shall first be examined under X-ray and thereafter cut to appropriate dimensions for conducting the following tests:
Provided that the radiographic examination of the weld, may be waived when the welder is to be engaged on production work where radiographic examination is not required under these regulations:-
One forward bend test, one reverse bend test, and two macro examinations,
The test piece shall be marked and cut out in the order shown in Figure XIII/5 and tested in accordance with the provisions of Regulation 611.
(b)Fillet plate welded specimen
They shall be conducted as detailed in Regulation 611 (b).
(c)Pipe and Tube welding
Specimens shall be prepared and tested as prescribed in Regulation 611 (c) or 611
(d), as the case may be.
(d)Additional test before rejection
Should any of the test pieces tested in accordance with the above sub-regulations fail to meet the specified requirements, one further weld may be cut from the specimen and subjected to the same test.
If any test piece does not reach the required standard, two further welds shall be made and the procedure in the above regulations repeated. If any of these welds does not reach the required standard the welder shall be deemed not to have qualified for a certificate.
Amendments found
Machine-assisted list from the amending notifications (DPIIT copies; 1990–1998 from scanned Gazette issues on India Code); may be incomplete.
| Date | Notification | Part | Action | What changed (summary) | Web edition |
|---|---|---|---|---|---|
| 2010-10-28 | G.S.R. 195 | (e) | Inserted | Inserts a right to be heard before refusal of a welder certificate. | listed before the capture |