Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 591 — Gusset Link, Brace and Similar Stays
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulations 591B, 591A. This page was revised after the 2019 capture, so later amendments may be included. Units as printed.
| [image] | [image] |
| ||||||||||||||||||||||
Earlier text: the 2008 DIPP web edition
Gusset Link, Brace and Similar Stays
For welded Lancashire, Cornish and cylindrical horizontal multi-tubular type boilers, all welded gusset stays shall not be used. To ensure flexibility, link stays, bar stays, brace stays and other similar stays or suitably designed gusset stays other than the all-welded type shall be used. All welded gusset stays, however, may be used in cylindrical horizontal waste heat and cylindrical vertical multitubular boilers.
Welded gusset stays and braces may be used for welded Lancashire, Cornish and Cylindrical Horizontal Multi-tubular boilers provided their method of attachment is approved by the Inspecting Authority.