Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 519 — (A) Thermometers
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulations 519A, 519B, 519C, 519D, 519E. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
|
VALVES AND MOUNTINGS | ||
| ||
| Reg. 519 B VALVES AND MOUNTINGS | ||
| ||
| Reg. 519 C VALVES AND MOUNTINGS | ||
| ||
| Reg. 519 D VALVES AND MOUNTINGS | ||
| ||
| Reg. 519 E VALVES AND MOUNTINGS | ||
|
Earlier text: the 2008 DIPP web edition
Regulation 519A — (A) Thermometers
Regulation 519B — Relief valves
Regulation 519C — Pressure Gauge
Regulation 519D — Air Release valves
Regulation 519E — Blow off drain valves
Regulation 519F — (F) Non-return valves in return feed line
Regulation 519G — Reserve Flues
Regulation 519H — Explosion Doors