Regulation 393 — REGULATIONS FOR THE REGISTRATION OF BOILERS AND INSPECTION OF BOILERS AND STEAM-PIPES

Unofficial DPIIT web edition · not verified6 amendments found

Text in the DPIIT web edition

Archived copy captured 03 Aug 2022 (Wayback Machine). The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.

Unofficial DPIIT web edition · archived 2022 · not checked against the Gazette

Reg. 393

Submission of manufacturing drawings and the particulars of boilers in advance:-

(a) In the case of land boilers made in India for use in the States, the manufacturing drawings and the particulars of materials, design and construction of boilers shall be submitted by the Makers of the boilers to the Inspecting Authority of the State, where the principal parts of the boilers will be manufactured, for examination and approval before commencement of the manufacture of boilers.
b) In the case of boilers made outside India for use in the State, the manufacturing drawings and particulars of the material, design and construction, of boilers shall be submitted initially to the Inspecting Authority in the country of manufacture for examination and approval.

The manufacturing drawings and the particulars of materials, design and construction in the case of fired boilers of steam generating capacity 100 tons/hour and above and that of Waste heat boiler of 20 tons/hour and above shall then be submitted to the Technical Adviser (Boilers) for selection of latest materials with high strengths and use in high temperature and pressure, energy conservation and increased thermal efficiency and remote control and instrumentation for the safety of the boilers. Thereafter, the manufacturing drawings and the particulars of materials, design and construction shall be sent to the Chief Inspector of Boilers of the State where the boiler will be installed and used, for final examination and approval before commencement of manufacture so as to avoid questions arising at the time of erection and registration of the boiler.
c) The Inspecting Authority or the Chief inspector or both, as the case may be, shall, after examination of the manufacturing drawings and the particulars intimate to the proposer whether they are satisfied with the materials, design, construction and fitness of the parts for the intended pressure and, if not, what modification is necessary therein. When the manufacturing drawings and the particulars of boilers have been approved, the Inspector in making his examination shall see that the design and the particulars of construction as approved have been carefully followed and that the material corresponds with the approved particulars.
(d) The fee for the scrutiny of the manufacturing drawings and the particulars of the materials, design and construction of boilers under sub-regulations (a) or (b) shall be on the scale prescribed in regulation 385 subject to a maximum of Rs.20,000/. When the manufacturing drawings have been scrutinised and in respect of them alterations have been suggested and the same are resubmitted for scrutiny, separate fee at the rate of 10% of the fee for the first scrutiny of the drawings shall be payable if the manufacturing drawings contain alterations other than those previously suggested.
 

(e)

The arrangement drawings showing the broad details of modifications or conversions of the existing boiler shall be subject to the approval of the Chief Inspector of Boilers of the State where the boiler is intended for modification or conversion is registered.

 

(f)

If the detailed manufacturing drawings are got approved by the Inspecting Authority of the State where parts will be manufactured and inspected, no separate compliance of sub-regulation (e) is required.

Earlier text: the 2008 DIPP web edition

REGULATIONS FOR THE REGISTRATION OF BOILERS AND INSPECTION OF BOILERS AND STEAM-PIPES

Submission of manufacturing drawings and the particulars of boilers in advance:-

(a)In the case of land boilers made in India for use in the States, the manufacturing drawings and the particulars of materials, design and construction of boilers shall be submitted by the Makers of the boilers to the Inspecting Authority of the State, where the principal parts of the boilers will be manufactured, for examination and approval before commencement of the manufacture of boilers.

b)In the case of boilers made outside India for use in the State, the manufacturing drawings and particulars of the material, design and construction, of boilers shall be submitted initially to the Inspecting Authority in the country of manufacture for examination and approval.

The manufacturing drawings and the particulars of materials, design and construction in the case of fired boilers of steam generating capacity 100 tons/hour and above and that of Waste heat boiler of 20 tons/hour and above shall then be submitted to the Technical Adviser (Boilers) for selection of latest materials with high strengths and use in high temperature and pressure, energy conservation and increased thermal efficiency and remote control and instrumentation for the safety of the boilers. Thereafter, the manufacturing drawings and the particulars of materials, design and construction shall be sent to the Chief Inspector of Boilers of the State where the boiler will be installed and used, for final examination and approval before commencement of manufacture so as to avoid questions arising at the time of erection and registration of the boiler.

c)The Inspecting Authority or the Chief inspector or both, as the case may be, shall, after examination of the manufacturing drawings and the particulars intimate to the proposer whether they are satisfied with the materials, design, construction and fitness of the parts for the intended pressure and, if not, what modification is necessary therein. When the manufacturing drawings and the particulars of boilers have been approved, the Inspector in making his examination shall see that the design and the particulars of construction as approved have been carefully followed and that the material corresponds with the approved particulars.

(d)The fee for the scrutiny of the manufacturing drawings and the particulars of the materials, design and construction of boilers under sub-regulations (a) or (b) shall be on the scale prescribed in regulation 385 subject to a maximum of Rs.20,000/. When the manufacturing drawings have been scrutinised and in respect of them alterations have been suggested and the same are resubmitted for scrutiny, separate fee at the rate of 10% of the fee for the first scrutiny of the drawings shall be payable if the manufacturing drawings contain alterations other than those previously suggested.

(e)The arrangement drawings showing the broad details of modifications or conversions of the existing boiler shall be subject to the approval of the Chief Inspector of Boilers of the State where the boiler is intended for modification or conversion is registered.

(f)If the detailed manufacturing drawings are got approved by the Inspecting Authority of the State where parts will be manufactured and inspected, no separate compliance of sub-regulation (e) is required.

Amendments found

Machine-assisted list from the amending notifications (DPIIT copies; 1990–1998 from scanned Gazette issues on India Code); may be incomplete.

DateNotificationPartActionWhat changed (summary)Web edition
1994-11-23G.S.R. 607 OCR of scan(d)AmendedAdds "subject to a maximum of rupees 20,000" after "regulation 385".listed before the capture
1994-11-23G.S.R. 607 OCR of scan(e),(f)InsertedInserts sub-regulations (e) and (f) on approval of drawings for modification or conversion of existing boilers.listed before the capture
1997-02-13G.S.R. 117 OCR of scan(b)SubstitutedReplaces sub-regulation (b): imported boiler drawings approved by Inspecting Authority, reviewed by Technical Adviser (Boilers) for large/waste heat boilers, then by State Chief Inspector.listed before the capture
2010-10-07G.S.R. 821(E)(c)AmendedAdds the Competent Person alongside the Inspector.listed before the capture
2015-08-26G.S.R. 664(E)(a), (b), (d)AmendedReplaces (a) and (d) and extends (b) to boiler components including spares.listed before the capture
2020-09-11G.S.R. 551(E)(d)AmendedCaps the fee at Rs. 50,000.check the text