Indian Boiler (Sixth Amendment) Regulations, 1994 (G.S.R. 607)
Amends IBR 1950 regulations 2, 4, 4A, 61, 113, 268, 310, 320, 357, 376, 379, 382, 391A, 393, 395A, 395C, 545, 554 and 611, inserts regulation 395G, and amends Form IV: adds definitions of calculation and design pressure, revises the creep-test note, foreign-firm recognition fee, hydraulic test rules, gauge-glass, flange, safety-valve and boiler-ageing provisions, and inspection fees. Substitutes Appendix J on stage inspection during construction.
Scanned weekly Gazette of India (Part II, Section 3(i)) of 10th December, 1994, as hosted by India Code and archived by the Wayback Machine (capture 2023-11-23). The scan also contains other notifications; only the Central Boilers Board notification is reproduced here. Reader's note: The notification in this file is printed 'G.S.R. 606' (New Delhi, 23 Nov 1994); G.S.R. 607 in this issue is an IGNOU statute amendment (lines 2310-2338). Later footnote chains (GSR 83/1995, GSR 93/1995) cite it as 'GSR 607 dated 10th December, 1994', so gsr kept as 607. Ministry heading is mixed into Hindi on page 8. Clauses 13 (382) and 14 (391A) are column-scrambled: the 391A body is at lines 1782-1833 before its heading at 1834-1839, and the tail of 379(iv) appears at 1728-1732. Draft was GSR 194 dated 5 April 1994. File No. garbled ('6(10)/92-Boilers'?); signed V. K. Goel, Secy. 391A text also cites 'regulation 7' (OCR-doubtful, left out of regs_mentioned).
Gazette scan (India Code copy, archived). Regulation numbers below refer to the IBR 1950, not the IBR 2026.
IBR 1950 regulation numbers appearing in the notification (includes incidental references; verification pending): 2, 4, 4A, 61, 113, 268, 310, 320, 357, 376, 379, 381, 382, 385, 391A, 393, 395A, 395C, 395F, 395G, 545, 554, 611
Not yet checked against the official notification (read from a scan by OCR); verify before relying on it.
MINISTRY OF INDUSTRY -
(flepsi trnct of Industrial Development)
Central Boilers flu-r1
New Delhi ) the 23rd November, 1994
G.S.R. 606.—Where
ecitain diaft reKulatiOnS further
to amend the Indian Boiler Regulations 1950, welc published
as required by sub-section (I) of ScCtlun 31 of the Indian
Boilers Act. 1923 (5 oft 923) St pages 637 to 648 of the (lazette of India, Part 11- section 3, sub-section (1), dated the
23rd April. 1994 under the notification of the Government
of India in the Ministry of Industry (Department of indus-
trial Development) (Central Boilers Board) No. GSR 194
dated the 5th April, 1994 Inviting objections and suggestions
from all persons likely to be affected thereby till the 10th July, 1994;
And \sllercris the said
Gazette was made available
to the public oil the 27th May, 994:
Aud wliei ens no objections or suggesrioist have been
received;
Now, threfoj e, In exercise of the powers cunfeircd
by section 28 if the Indian Boilers Act, 1923 (5 of 1923),
the Central Boilers Board heteby makes the following iegula-
linus further to amend the Indian Boiler Regulations, 1950,
titluiely
1 . (I) These ieguletiiins may be called the Iil'liaii Boilci
(Sixth Amendment) Regulations, 1994.
(2)They shall conic Into force on tIte date of their publica-tion in the Official Gazette,
2. In the Indian Boiler Regulation, 1950 (hereiisaftet
referted to as the said regulations), it, regulation 2,-
(a)after clause (c), the following clause shall be inserted,
namely
"(cc) "calculation pressure", in relation to a boiler,
means the design pressure of any Pat adjusted to take
into account the pressute diops corrspondiiig to the
tnost scVerC conditions of pressure drop and hydraulic
head;"
(b)after clause (dd), the followitsg clause shell be inserted, namely
"(ddd) 'design pressure" means,-
(i)in relation to a natura l or assisted circulation b o iler, the maximum allowable woj king pressure in the steam
drum of the boilce;
(ii)in relation to a once through forced-circulation boiler,
the maximum allowable working pressure at the hinal
superheater steam outlet
3. In the said regulations, us regulation 4, in sub-regula-
tion (c), in paragraph (Vi), in the Note, li.r paragraph (c)
the following paragraph shall be substitut ed, namely
'(c) Each grade of steel is tested at three temperatures,
namely 500°C'. 550°C and 600°C for T22 grade of
steel and 460°C, 500°C and 550°C for 112 grade of
steel and at three stress level to give rupture lives of
1000, 3000, 10000 hours at each temperature and tak-
ing two specimens under each test condition in con-
form ty with the code/Specification to which fit . steel
is
2090 THE GAZETTE OF INDIA: DECEMBER 10, 199'1 /AGRAHAYANA 19, 1916 [PART 11--SEC 3(i)3 4
In the said regulations, in regulation 4A, after sub-
regulation (I), the following sub-regulation shall be inserted rnicIy
"(4) In ease of foreign firms seeking recognition as ''Well-
Known Steel Ma kei ", 'Well-known Pipe/Tube Maker",
"Well-known l-ouridi'y" or "Well-known Fo,ge", a
fec of US 8 10,000 (Ten thousand US Dollats) only
shall he deposited aloiigwith the completed ques-
tiotinaire lot in. l'hc [valuation Committee shall
carry out the evaluation within 120 days of the receipt
of the fees.".
5.
In the said regulations, in regulation 61, in sub-i egula-
don (a), the following proviso shall be added at the 'end,
namely
"Ptovided that the test may be dispensed with by the Ins-
peeling authority if the tube is subjected to non-destructive
testing by an a pprnoi late method like ultrasonic or/and
Eddy curtent tcrtirig.'".
6.
In the said rcgulatiotss, its tcgulation 113, alter sub-
regulation (b), the following sub-regulation shall be inserted, namely
"(bb) In the construction of unfired boilers when the dished
ends do not form a part of the heating surface, cold
spun dishcd ends conforming to IS 2825 may
be
used.".
7.
In the said regulations, for regulation 268, the follow-
ing tegulation shall be substituted. namely
"268. Nydiaullc test at makers' works
(a)Boiler drsint and other cylindrical cotnponents having
internal diameters greater than 600 millimetres shall
his hydraulically tested on completion of manufacture
at the makers' works in the presence of Itispecling
Officer to 11 times the maximum permissible working
pressure without indication of weakness and defects.
(b)All components which are not reasonably accessible
for inspection after assembly into the holler or have
been tested hydraulically prior to welding at a pressure
less than that specified in sub-regulation (a) shall be
tested hydi tiulically to 14 times the maximum working
pressuic before assembly into the boiler.
(e)Tubular products that have been hydraulically tested
to the required ptessure prior to welding or ultra-
sonically tested shall not equire fun tticr hydiaulic
testing as components provided they were joirci
during assembly by clrcum rife rential but joint which
have been welded and non-destructively tested as per
clevamit piovisions of these regulations.
(d)Components other than tubular pioduets shall not
requime hpdraulic testing before assembly into the
boiler if the comnpkted boiler is tested hydraulically
to II times the otaxinsunt permissible working
pressure at site.
(e)In case of cii urns, headers which are to be fitted with
tubes, the test may be made before drilling of tube
holes but aftcm attachments of nozzles and vimilat
fittings.
(f)The rest pressure shall be taised wadually under proper
control at all times so that it never exceeds by more
than 6 of the acquired pressure and maintained for
30 nuriutes whci eupon the ptessure shall be reilued
to maximum allowable working pressure and main-
tamed foi sufficient time to pci mit close visual inspec-
tion for leakages of thi p1 essure pat is
(g)The tCinperaturc 01 sSa Icr used as medium of presstiie
testing shall not he less than 20'C and more than 5ty'C.
Os) in case of drums of 'composite' Construction and
partly rivetted arid partly welded scions or seamless
foiged drum shell with cods attached by fusion weld-
ing, the test pt cssttl e shall he the same as for fusion
welded drums.
(i)Should the hydraulic test reveal any defects in the weld-
ed steam, it shall not be repaired unless the Inspect-
ing Authority permits to do so.
(j)On completion of agreed repairs to a drum which has
previously been stress relieved by heat-treatment,
further heat-treatment, if requited by the Inspecting
Authority, shall be done and the drums shall again
he subjected to hydraulic test.''.
8.
In the said regulations, in regulation 310, for sub-
regulation (I), the following shall he substituted, namely :-
(I) The permanent set in tile spring (defined as the
difference between free height and height measured
ten minutes aftci the spring has been compressed solid
three additional times, after prcse(tirsg at room tem-
perature) shall not exceed 0.5 of the free height.".
9.
In the said regulations, in regulation 320,-
(a)for sub-regulation (a), the following sub-i'egulatioris
shall be substituted, namely :
(a)Every boiler shall have two ntcistis of ittdicatitig the
water in it of which onc shall be conventional guage
glass:
Provided that in the case of boiler drums below 3 feet
(91 cm) diametet where their is difficulty in fitting two
water guages, two test cocks and a glass water guage
shall be fitted,'.
(b)sub-regulation (N) shall be omitted;
(c)sub-regulationt (c) and (d)shall respectively here-lettered as sub-regulations (b) and (e):
(d)in sub-regulation (b) as vu i'cle'ttered,-
(i)for the figure atsd word "2 inches", the figures and
word "50 millimetres" shall be substituted:—'
(ii)the following shall be added at the end, iiaintly
"Mitsinnum length of the visible portion of the
guage glasses shall be 200mm. The length may
be increased depending upon the capacity of the
boiler by the Chief InspectorjDimector of
Boiler of the manufacturing State.".
0.
In the said regulations, in regitlahiciii 357, in sub-
regulation (b),—
(a)for words and figures "Figure Nos. 28 to 34'', the
words and figures "Figure Nos 28 to 34A" shall be
substituted,
(h)after type 7 and the entry relating thereto, the billow-
big shall be added, namely
"8, Socket welded flange Figure 34A.".
(c)in the design conditions, the following shall be added
to n'iaxinium allowable working prcsure and main-
at the end, namely '
mined for Sufficient time to permit close
NUlll iflS-
pection for leakage of N CssttrC parts.''.
"Type 8 flanges for all design pressure and tempera-
tore conditions. This type shall be used only for
pipes upto and including 51 nuns (2 inches) noni intl I
hore. Thea.' flanges shall not be used u here Severe
ci osiun or corrosion is expected to occur.''.
(d)after figure 34, the folloss ing figure SJIAII be inserted, namely
13. Jo the said regulalion, in regulation 3iC, in sub-
regula'ion (a). in the list of Siaiea!l_Inioii TercitoriCs with their di iingu'sh log letter, aftei the entry the following Ill II he insetted. no ire l
'Megliulara........ rvlL
'9
x',n - t ,C is (NOMINAL PIPE WALL 1l'IiCStstSS)
OR 1iiCXN5S OF rL,NGt t'1iJ w-tJCtiEVCR 15 SMALLfS,
SOCKET WELDED FLANGE
FIGURE NO 34A
II.
In titO said i egulatioris, in regulation 376, for sub-regit-
lation (e). the following cub-regulatIon shall be substituted, namely
"(e) No blank flange/plug shall be inserted betsscen a
safety valve chest and the boiler genetally and wheic
it Is permitted by tho Inspector the blank flange/
plug shall be removed in his presence.".
12. In the said regulations, in regulatico 379, for Sub-
regulation (a), the following shall be substituted, namely
'(a)(i) Subject to the provisions of sub-teget taticn () of
regulation 381, every boiler shall be hydraulically
tested after erection at site in presence of the Inspector
to 1 I times the itsaximurri working pressure as certified
by the Inspecting Authority in Fat-rn TI, to be stamped
on the boiler, as frec from any indication o wdllltnesc
or defects.
(.ii) If all coitsponcntc if the boiler in the manufacturers's premises hasc not been tested hsdraulicatly is per
regulation 268 the test, on completion, cltall be taken
to l I times tIC rnaXiMUM %yorking pressure.
(iii)Tine ternpe attire of the water ited ss madittiii of
pressure tesiiiig chnll not be lest thtin 2ttC and greater
than 5flC
(iv)The test pressure shall he raised gradually unlci pro-
per Control at all times so that it never esceeds by more
than S
of the recp,fired pIe.sure and maintained for
lit minute, ss'hercupon the pressure shall he reduced
267
(i)In order to take the ageing effect on boilers, the work-
ing pressure of the pasts of them as calculated from
the formulae in these regulations thall he reduced
as per the table given below
TAttLE
Ageot'buiter
25 35 45 50 hO 70 80 90 100
exceeding (in eats)
Masiinuni perittitte1t 95 90 itS RU
'ii) 60 50 40
30
working pressure
perccn I.
lii) Fm thnsc boilers and plates of which have already
been emit aiul tested under regulumicn 7 sod this regula-
tion shall be given a t'tmhhcr lease of lift of 50 years
from (fledttte of the tct of the boilers. The vorktiit
pressure that shall he allowed after the testing shall be
reduced is per the table given below
T,\ ILl,
period after date of test (in yea! s)
to 20 30 JO
SO
Maximum working pressure allowed
90 80 70 50 II)
(percentage),
(h)Water Tube Boilers
(i)The boilers which are operating at a temperature of
400C and above including utility/industrial boilers
and all boiler parts operating in the creep range of the
boiler shall he non-destructively tested after they any
ii operation for 100,004) hours for assessment of the retitaneist I ic of the parts
(ii)The parts ofa boiler when it completes a. life of 25 years sic to he tested for assessment of the renlanent life
of such parts. ff results are acceptable as per the
standard laid down by the Central Boilers Board a
certifteate tltal) Nt issued by the Chief Inspector of
boilers for cx tending the life of the boiler for a further
period of 10 )ears or ',ucft less period its rreommnd.
ed by the Remancist Life Asscs5ment Oi - anisatiois.
this assessrnemst of rcmrtitets, life Shall he carried out
thereafter every (iso years by the !iri' ,ifltSatiOfls p. ork-log in tile field of boilers and romitnent life and eaten-
ston thereof after such orgtirsmsetion is approved by
the . erttr,il Boilers 190,11'd. Such olgattisation shall
work in close coordination scab tlic otT'ie of the Tech-
meal Advisoer (Boilers) in the field of remaneni life
assessment and aistensiuri The working pressure of'
such boilers may he reituced on the rccomnieirta-
tions of such approved organisation.'.
14.
lii tflc said
1 cgstla I '1115, for regulalim , 391A, the
Ibtiowing regulation shall be substituted, namely
'391A. Ageing of boitc.--
(a)Shell Type Bodet S
2092 THE GAZETTE OF INDIA DECEMBER 10. 1994 /AGRAHAYANA 1-), 1916 [PART 11--SEC. 3(')l
15. In the said regulations, in regulation 393,—
20. In the sold tegutations, in tegulation 554, for figures
(i)hi sub-regulation (d), after the uord and figures Xfl153, X11/54 and XII/56, the following figurcc shall res-"regulation 385". the words and figures "subject
pectivelv he substituted, nameR'
a maximum of rupees 20,000/- shall he added.
(ii)after sub-regulation (d), the following suh-rcgul.oi.ns
shall be added, namely
(e)The arrantcnint drawings showing the broad details
of modifications or conver&lons of the existing boiler
shall be subject to the approval of the Chief Inspector
of Boilers of the State where the boiler is intended for
modification or conversion is registered.
(I) if the detailed manufacturing drawings are got approv-
ed by the Inspecting Authority of the State whete
parts will be manufactured and inspected, no separate
compliance of sub-regulation (e) is required.".
16. In the said regulations, in regulation 595A, for sub-
regulation (3), the following sub-regulation shall he sub-
stitutcd, namely :-.--
"(3) For Inspection of tubes and pipes, the fees shall he
charged at the rate of Fs, 100/- pet metric tonne or a
fraction thereof.".
17. In the said regulations, in regulation 395C, for sub-
regulation (1), the following sub-regulation shall be sub-
stituted, namely
"(1) SubJect to a rpinimuni inspection fee of Rs. 300/-
per inspection for the valves, the inspection (cc shill
be charged as under
(a)Upto 25mms. .. . R. 5 per piece.
(b)Above 25mm3 and upto 50 mins. .. . Rs. 10 per piece.
(c)Above 50rnens and upto 100 mms, ,, . Rs. 20 per piece.
(d)Above 100 mms and upto Z50 mnis, ., .Rs. 100 per piece.
(e)Above 250 mms. .. . Ra. 200 per piece.".
18. In the said regulation, after regulation 395F, the
following regulation shall be Inserted, namley :-
395G. Fee for inspection of spares and scantlings
The fees for inspection of sprees and scantlings shall be
charged as under
(a)For outside surface area not exceeding lilsq. ft. (0 93 m) Rs. 300.
(b)For outside surface area exceeding 10 sq. ft (0.91m 2 )
but not exceeding 30 sq. ft. (2.79 ma). .. . Rs. 400.
(c)For OSA exceeding 30 sq. ft. (2 79 m 2 )
but not exceeding 50 sq. ft. (4.65m2). ., . Rs. 450.
(d)For OSA exceeding 50 sq. ft. (4 65 m2)
but not exceeding 70 sq ft. (6.5 m, ,. . Ri 550
(e)For OSA exceeding 70 sq. ft (6.5 rn)
but not exceeding 90 sq. ft. (R 36tn 2). .. . Rs. 650.
(1)For OSA exceeding 90sq. ft. (8.361n')
but not exceeding I lOsq. ft. (10.22ni I .. . Rs. 750
19. In the said regulations, in regulation 545, after sub-
regulation (c), the following sub-regulation shalt he inserted, namely
"(cc) In the construction of unfired hollers when the dished
ends do not form a pait of the heating surface, cold
spun dished ends conforming to IS 2925 may he
used.".
It.t. ¶ALI HCLI
4-
Yiur No'. XXI153
ILL Ati 4Qt.I
Ti
,l'd' '
t5
'Figure 1'lo, XJI/51+
(:
p41
dt IIIt
llgLro N., xII/56
-
21. In the said regulations, in regulation 611, in
sub-regulation (a), for the word "X-Ray", the word
"radiographic" shall be substituted.
22. In the said regulations, in Form TV relation to
he Steel Maker's Certificate, for the portion hegniun-
ing with "we hereby certify that" and ending with
" in accordance with the standards", the following
shall be substituted, namely
- Wc hereby certify that the material described
below has been made by Mfs ................by
the .....................process, as per
specifications ............and rolled by .........
and has been satisfactorily tested in the presence of
our Test House Manager or his representative in
accordance v tb the stipulated tests Ind tolerances,
For gothic bars/seclps, billets and hot rolled strips
which are to he processed further by the same
manufacturer for making tubes/pipes, the physical
properties are not required to he nleruioned by th
-,tee manufacturer."
23. In the said regulations, for Appendix J, the
(f)When welding of drum or shell is completed and
following Appendix shall be substiuted, namely :--
to check the records of heat-treatment when
heat treatment is
required
under these
"APPENDIX
regulations;
Inspection and Testing
of
Boilers
during
(g)When weld test specimens have been prepared
construction,
from the test plate, previously selected to wit-
GENERAL
'less the required testing!
'File Inspecting Authority shall have access to the
sorks of the manufacturer at all reasonable times and
shall inspect the manufacture of the boiler at least
at the following stages and may reject any part that
does not comply with tue requirements of the Indian
Boiler Regulations, 1950. In case of any doubt, the
Ttispceting Authority may e\amine it any stage other
than the stages stipulated helos The manufacturer
shall give at least 4 working days' notice to the Ills-
pecti ng Authority/tn specting Office, before teaching
each stage. Before undertaking any of Lite stage
inspections, the Inspecting Authority/I ni specting
Officer shall satisfy hinielf that the testing equipment
insti ument has been properly calibrated.
Inspection during construction
Each boiler shall he inspected during construction
by an Inspecting Officer nominated by the inspecting
Authority. Sufficient inspections shall he made. to
ensure that the materials, construction and testing
conform to the requiremenLs of these regulations.
Stages of inspection during construction
A. Shell Type Boilers
(a)(i) Check the identification markings on the
plate with those recorded on the plate
makers' certificates;
(ii)Check the reported result of tile mechanical
and chemical properties on the plate
makers' certificates against the require-
ments of the Indian Boiler Regulations,
1950.
(iii)Witness the marking of the test plates for
identification before they are cut from the
parent plate or plates.
(b)When the Shell plate and end plates have been
formed with plate edges prepared for welding
and test plates are attached:
(c)When INC welding of main C) hi adrical shell is
completed and checked for ciruiarity
(d)To c'atnmne radiographs amid, or reports of non-
destructive testing;
(e)When openmug have been prepared and
Wild
pipes and similar connections i iseluding end
plates have been tackwelded in posw art and
subsequently on
completion
(h)During hydraulic test, followed by external and
internal examination and stamping.
B. Water Tube Boilers
1. WeJdd drums and headers
(a)
(i)When the plates are ready for identification
is ith plate mill certificates at boiler maker's
works and cut to size ready for forming to
cylinderieal shape:
In laying out and cutting the plates, the
plate identification mark shall be located
so as to he clean) visible after the boiler
part is completed. if the plate's identi-
fication mark is unavoidably cut out, it
shall be transferred by the manufacturer
another part of the component to the
satisfaction of the Inspecting Authority;
(iii)The Inspecting Authority shall identify weld
test plate material if production weld tests
are required.
(b)When the plates are formed to cylindrical shape
with the edges prepared for welding and set up
in readiness for commencement of welding and
attachment of test plates.
(c)When the welding of the main cylindrical shell
is completed, the shell checked for circularity
and the radiographic or ultrasonic test reports1
ILLOt'ds are available for scruitiny:
(d)When the end plates are ready for identification
with the mill certificate, formed to shape with
weld edges prepared and set on to the cylindrical
shell in readiness for the circumferential welding
operation.
(e)When the welding of the end plates to the drum
or the header is complete and the radiographs or
ultrasonic examination records are available for
scruti fly;
(f)When each drum or header is prepared to receive
any compensation plates and attachments, and
svheri at least 10' ,0'of each type of branch or
tube stub is set up ready for welding;
(g)When all welding on each drum or header i
complete, the Inspecting Authority will check
the records of heat treatment, and mark off of
specimens for preparation and testing from
test olates
2094 THE GAZETTE OF TND1A DECEMBER 10, 1991 /AGRAHAYANA 19, 1916 [PART II—Sec. 3(i)1
(h)At hydraulic test followed by external and
internal examination and testing and stamping.
On alloy steel drums thicker than 50 millimetres
and high carbon steel drums thickcr than 100
millimetres further non-destruci ye examina-
tion shall be done on drums, nozzle and stub
weld after stress relief;
(i)Any drum having tube holes drilled
subsequently to the hydraulic test shall be Further
examined on completion of this work and prior
to despatch from the manufacturers work.
C. Seamless Drums and 1-leaders
(a)When material i5 ready for identification uith
the steel makers' Certificate of Manufacture and
test, also isheit each cylinder is prepared for
forming, or welding at' separate end closures
and to identify test plate material
(h)When each plain shell drum or header is pre-
pared to receive compensation plates and attach-
ments and a representative number of stand
pipes, tubes or tube stubs, are set up ready
for welding
(c)When all welding on each drum is complete and
the radiographs or ultrasonic test records are
available the Inspecting Authority shall check
the record of heat treatment arid the marking
off preparation and testing of specimens from
test plates:
(d)At hydraulic test, followed by external and
internal examination and stamping,
oil thick
drums of high carbon or alloy material further
non-destructive examination shall be done on
drum nozzle and stub welds after stress relief.
D. Tubes and Internal Pipings
(a)When the tubes or pipes are ready for icleiiti-
fication with the tube makers' certificate at the
boiler makers' works and at least 10 of tubes
and pipes arc set up ready for welding:
(b)When all -welding of tubes or pipes arid their
attachments are complete and the non-destruc-
tive examination report/ records are available for
sci'u tiny.
I nspct ions arid tests to b 5arrred out
Makers' \Ver ks Foundry Eoroin
I juts
and the
pipe ni'td tube vaker' works hy
thc,
I ncpect in
Auth o rity
I. Steel hltkcrs Works.
i) When tho billets, plates, angle, hats or any
other part to he used in the eu'rstrUclinrr OF the
boilers
(i)checking of' lire chemistry of sicl as per
regulation;
(ii)riarking the test ,j)"iiacii for the mechanical
test;
(iii)Final testing.
Note—Notwithstanding anything specified above
wirer e the stcei is made by t he \VeiI-ktrnsvn Steel
Maker as recognised under the Indian Holler
Regulations, 1950 by the Ccrtral Boilers lloerd these
tesiswrll be carried out and certified by tile Steel
Makers themselves and the rec)rd', ni'aiutained The
certificates
5) issued will be accepted by the
Inspecting Authority of or turthier use.
2. Foundi , 1
rging Unit,,-
When bilIeLs bars for fit ging are received and
ready ft ide it tls atit ii
(if Chemical analysis @1 tIre castiiigs;fot ging
mater ial;
(ii)Marking and mechanical test tog of the tct specimen, of easti ngs'furging'.
NOLC : - Notsvithstand inc any'ti tug specified above.
when the castings/Corgings are macic by well-known
foundriesft'orging units as recognised under the
Indian Boiler Regulations, 1050 by the hentat
Boilers Board then tests will be carried out and
certified by the FoundriesFarges themselves and
all records are maintained properly. The certificates
so issued shall be accepted by the 1 nspceting
Authot ity for fur ther use.
3. Pipe and Tube Maker's
(a)When billets, plates ire reedy for' ideitilieitiun:
b) When pipe"'/tubes rue ready for exaisiriati
t
and selection or nwclianieai Icit it'tr rr'-
nittlisiig
(c)'.'hen the tet speciniclis tre ready for testing
(d)When pipe. ;tubes arc ready for hyd r'aui ; LC,15
or the ion-destructive examination.
Note :
otwithstanding anything specified above,
when the pipes:tuhes ace mOo Lii'iCtil ret by well-
known pipes;iubes makers lee ig rued unLler the
lndioir Bill- Regulalhns. 11).-, 1 by the enti'ah
Bnibr s Board all the above tages of fl51)Ct C 0,
,hall he earned out and cart iiied by t he n - anu-
facturer
of pipes and tubc'. tirencelves and
records nitintained, '('lie certificate, so issued be
tire rnitnuta furers in the prescribed Form
, Of
I ndiai Boiler Regulations, 1050 shall be accepted
hy the inspecting Authority for furl her use.
4. inspectie ii. and ts1s to he carried Out 'it the
Fabricators' Wot ks for fabric'attrn of' itciris.
lor parts inaiiufacturcd from the tubes/pipes at the inantitacturers'
oiks either by manipulation 01
rr fabricatioji.
(a)Identification
of materials:
(i)2
(ii)
(b)Checking of dimensions:
(c)Hydraul ic test.
V. Valves aid Mountiiig
(a)\Vhien pre-oosting m iterals are ready
for
C\iliflifltt to]) and L eleciio ii for ei
(b)When the test speeinien ace rotdy for lc' - t "
(c)Non-Desi ructive 1 c-dig
.t
required uniter
I id an Baler Regul st ion.
)d) Vhcn the paris u e machuwd and acmb1ed
and
are ready for d menional check in
tccordtnee with the dia's togs tippoved by
the Inspecting AtILiZo tIe.
Ic
Hydmi,11 1C test as per approved drawings.
-NotwithsLLtullng an thing specified above
in case of
Well-known 1- a und ries/Fores, etc.,
the fIt st two stages of inspect ion will be cart ied
out by the
Coundi iestFovges ilieritselves, and
certified and record maintained. The certificate
o issued shl1 be accepted byihe 111pc.l ins
Authot ity for further use.
[File No (( 0)92-Boilers]
V. K. GOEL, Secy.
FOOT NO lE : —Tllc principal regulations were pub-
lished jut the Gazette of India as S.R.O. No-. 600
dated 15111 September, 1950 and last an-tended vide
Gazette notifications
(i)GSR 178 dated 24th March. 1990.
(ii)GSR 179 dated 24th March, 1990.
(iii)GSR 488 dated 9 th Octobe'r 1993.
(iv)GSR 516 dated 23rd October, 1993
1.
(v)GSR 634 dated 25th December, 1993.
(vi)GSR 107 dated 26th February. 1994.
(Ernia GSR 223 dated 14th May, 1994).
(vii)GSR 250 dated 4th June, 1994.
(viii)GSR 402 flitted 12th August, 1994,
(ix)GSR 427 dtitccf 20t1i August, 1994.