Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 390F — Fire Surfaces.-Bulging, Blistering, Leaks
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulations 390D, 390E. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
| Reg. 390 d
Reg. 390 e
Reg. 390 f
|
Earlier text: the 2008 DIPP web edition
Fire Surfaces.-Bulging, Blistering, Leaks
Particular attention shall to given to the plate or tube surface exposed to the fire. The Inspector shall observe whether any part of the boiler has become deformed during operation by bulging or blistering; the former is a distortion of the entire thickness of the plate or tube where it takes place, while the latter is a lamination or separation of the plate due to foreign material being embedded in the ingot before the plate is rolled. If bulges or blisters are of such size as would seriously weaken the plate or tube and especially when the leakage is noted coming from those defects, the boiler shall be discontinued from service until the defective part or parts have received proper repairs. Careful observation shall be made to defect leakage from any portion of the boiler structures, particularly in the vicinity of seams and tube ends. Fire tubes sometimes blister but rarely collapse; the Inspector should look through the tubes for such defects and if they are found with a sufficient degree of distortion they should be removed.