Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)

Regulation 374 — Test Pressure

Unofficial DPIIT web edition · not verified2 amendments found

Text in the DPIIT web edition

Archived copy captured 03 Aug 2022 (Wayback Machine). The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.

Unofficial DPIIT web edition · archived 2022 · not checked against the Gazette
Reg. 374

STEAM-PIPES AND FITTINGS

Test Pressure

a)

Each completed pipe and fitting shall be tested by hydraulic pressure as per requirement of Chapter II.
b) Pipes and fittings with flanges for steam pressure exceeding 7 kg/cm² (100 lbs. per sq. in.) shall be tested with blank flanges bolted or clamped on. All other pipes, if straight, may be tested between the heads of an ordinary hydraulic pipes testing machine.
c) The piping system shall, after erection, be subjected to a hydrostatic test pressure. The hydrostatic test pressure at any point in the piping system shall not be less than 1.5 times the design pressure but shall not exceed the maximum allowable test pressure of any non-isolated components such as vessels, pumps or valves. At no time during the hydrostatic tests shall any part of the piping system be subjected to a stress greater than 90% of its yield strength (0.2% off set) at test temperature.

Notwithstanding anything contained in this clause, for boiler external piping and non-boiler external piping which are open to atmosphere such as vent and drain pipes, the hydraulic test for the portions of such pipes located beyond the last isolation valve may be dispensed with provided the weld joints in the pipe under reference are tested 100% by approved non-destructive examination and found satisfactory.

d) Special arrangements shall be made, according to circumstances, for testing bends and other fittings which are not flanged.
e) Hydraulic testing of butt welded and socket welded joints shall be conducted either at maker’s work or at user’s premises on completion of fabrication of pipes by the Inspecting Authority.
f) Hydraulic testing of fabricated pipes having attachments of flanges, fittings, butt joints, branch joints and weldolets shall be done at manufacturer’s works or alternatively at site at 1.5 times the design pressure. Where hydraulic testing of fabricated pipe joints is not carried out at manufacturer’s works, dye-penetrant test shall be carried out on the welded joints alongwith five percent radiography of such joints.

Earlier text: the 2008 DIPP web edition

STEAM-PIPES AND FITTINGS

Test Pressure

a)Each completed pipe and fitting shall be tested by hydraulic pressure as per requirement of Chapter II.

b)Pipes and fittings with flanges for steam pressure exceeding 7 kg/cm² (100 lbs. per sq. in.) shall be tested with blank flanges bolted or clamped on. All other pipes, if straight, may be tested between the heads of an ordinary hydraulic pipes testing machine.

c)The piping system shall, after erection, be subjected to a hydrostatic test pressure. The hydrostatic test pressure at any point in the piping system shall not be less than 1.5 times the design pressure but shall not exceed the maximum allowable test pressure of any non-isolated components such as vessels, pumps or valves. At no time during the hydrostatic tests shall any part of the piping system be subjected to a stress greater than 90% of its yield strength (0.2% off set) at test temperature.

d)Special arrangements shall be made, according to circumstances, for testing bends and other fittings which are not flanged.

e)Hydraulic testing of butt welded and socket welded joints shall be conducted either at maker’s work or at user’s premises on completion of fabrication of pipes by the Inspecting Authority.

f)Hydraulic testing of fabricated pipes having attachments of flanges, fittings, butt joints, branch joints and weldolets shall be done at manufacturer’s works or alternatively at site at 1.5 times the design pressure. Where hydraulic testing of fabricated pipe joints is not carried out at manufacturer’s works, dye-penetrant test shall be carried out on the welded joints alongwith five percent radiography of such joints.

Amendments found

Machine-assisted list from the amending notifications (DPIIT copies; 1990–1998 from scanned Gazette issues on India Code); may be incomplete.

DateNotificationPartActionWhat changed (summary)Web edition
1997-03-19G.S.R. 172 OCR of scan(f)SubstitutedReplaces (f): hydraulic test of fabricated pipes at 1.5 times design pressure at works or site; otherwise dye-penetrant and 5% radiography.listed before the capture
2002-04-09G.S.R. 127(c)AmendedAdds at the end a relaxation of hydraulic testing for piping beyond the last isolation valve where welds are fully NDT tested.listed before the capture