Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 347D — Additional test
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulations 347C, 347E. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
| Reg. 347 C Reg. 347 D, Reg. 347 E
|
Earlier text: the 2008 DIPP web edition
Additional test
Should a pipe selected for testing fail in any one or more of the tests specified above, two further tests of the same kind may be made from the same or another pipe from the same batch. Should either of these further tests fail, the pipes represented may be reheat treated and then re-tested. If the repeat tests are satisfactory, the pipes shall be accepted provided they comply with other requirements but if failure again occurs, the pipes which the test pieces represent shall be rejected.