Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 328 — Connections
Unofficial DPIIT web edition · not verified0 amendments found
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulations 327, 329. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
Unofficial DPIIT web edition · archived 2022 · not checked against the Gazette
| Reg. 327, Reg. 328, Reg. 329 | |||||||||||||||
Reg. 328 Connections
Reg. 329 Gauge Cocks
|
Earlier text: the 2008 DIPP web edition
Connections
All pressure gauges shall be fitted with a syphon pipe and a cock or valve integral with, or adjacent to, the gauge in such manner that the gauge may be shut off and removed whilst the boiler is under steam.