Regulation 241 — Additional tests before rejection
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulations 242, 243, 243A. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
|
Additional tests before rejection | |||||||||||||
Reg.242 Discard
Reg.243 Forging
Reg.243A Tolerance
| |||||||||||||
Earlier text: the 2008 DIPP web edition
Additional tests before rejection
Should either a tensile or bend test fail, two further tests of the type which failed may be made on test pieces cut from the same test rings. If the results obtained from these retests are satisfactory, the drum shall be accepted, provided that in other respects it fulfils the conditions of this Chapter. If these re-tests do not give satisfactory results the drum represented may be re-heat-treated together with the remainder of the test rings, and presented for further testing.
In all cases where final re-tests do not give satisfactory results, the drum represented by the test pieces which fail shall be rejected.