Regulation 227 — Cross Tubes
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulations 228, 229. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
| Reg. 227, Reg. 228, Reg. 229 FURNACES Cross Tubes The working pressure of the tubes shall be determined by the following formula :-
where W. P. = working pressure in lbs. per sq. inch. t = minimum thickness in 32nds of an inch. D = the internal diameter in inches of the cross tube. Reg. 228 FURNACES Uptakes of Vertical Boilers The working pressure for uptake tube of vertical boilers shall be determined by Eqns. 57 and 58 but only half the least pressure so found is to be allowed for uptake tubes. Reg. 229 SUPPORTS FOR COMBUSTION CHAMBER AND FIREBOX CROWN Girder stay for firebox crowns
|
Earlier text: the 2008 DIPP web edition
FURNACES
Cross Tubes
The working pressure of the tubes shall be determined by the following formula :-
200 (t - 7)
W. P. = Eqn.(64)
D
where
W. P. = working pressure in lbs. per sq. inch.
t = minimum thickness in 32nds of an inch.
D = the internal diameter in inches of the cross tube.