BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)

Regulation 131 — Longitudinal Stays

Unofficial DPIIT web edition · not verified0 amendments found

Text in the DPIIT web edition

Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulations 130, 132. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.

Unofficial DPIIT web edition · archived 2022 · not checked against the Gazette
Reg. 130, Reg. 131, Reg. 132
STAYS
Bar Stays

Bar stays shall not be welded at any part. They shall preferably have plus threads, the ends of the stays being upset or the middle portion being reduced for this purpose. Stay bars which have been worked in the fire shall be subsequently annealed.

Reg. 131
STAYS
Longitudinal Stays

a) Longitudinal and similar solid screwed stays shall be efficiently secured with nuts at each end and not merely revited over. Where they are over 12 feet in length, they shall be supported at intervals of 6 ft. along its length.
b) Where the stay is screwed through both plates, the stay and holes shall have a continuous thread and fitted with nuts and washers on the outside. Where the stay passes through clearing holes an internal nut and washer shall also be fitted. Where the stay is not normal to the surface of the plate the washer shall be shaped so as to form a true surface for the nuts or a knuckle joint may be fitted.
c) In vertical boilers the stays shall either be screwed into both crown plates or screwed into the furnace crown plate and passed through clearing holes in the shell crown plate.


Reg. 132
STAYS
Nuts and Washers for Stays

a) The washers shall be at least 2½ times the diameter of the threaded portion of the stay and not less than ¼ inch in thickness.
b) The thickness of the external nuts shall be at least equal to the diameter of the threaded portion of the stay. Where bar stays pass through clearing holes in end plates, internal nuts of a thickness not less than two-thirds of the diameter of the threaded portion of the stay shall be fitted.
Earlier text: the 2008 DIPP web edition

STAYS

GENERAL

Longitudinal Stays

a)Longitudinal and similar solid screwed stays shall be efficiently secured with nuts at each end and not merely revived over. Where they are over 12 feet in length, they shall be supported at intervals of 6 ft. along its length.

b)Where the stay is screwed through both plates, the stay and holes shall have a continuous thread and fitted with nuts and washers on the outside. Where the stay passes through clearing holes an internal nut and washer shall also be fitted. Where the stay is not normal to the surface of the plate the washer shall be shaped so as to form a true surface for the nuts or a knuckle joint may be fitted.

c)In vertical boilers the stays shall either be screwed into both crown plates or screwed into the furnace crown plate and passed through clearing holes in the shell crown plate.