BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)

Appendix-JA

5 amendments found4 later amendments not in this text

This provision is not in the 2008 web edition as a separate page; it may have been inserted later (see the amendments below).

Amendments found

Machine-assisted list from the amending notifications (DPIIT copies; 1990–1998 from scanned Gazette issues on India Code); may be incomplete.

DateNotificationPartActionWhat changed (summary)
2005-12-15G.S.R. 423 OCR of scanInsertedInserts Appendix JA on inspection of power utility boilers after Appendix J.
2007-03-12G.S.R. 46 (copy) 2008 web editionSubstitutedSubstitutes Appendix JA: inspection of power utility boilers by working pressure (50 kg/cm²) and age (20 years).
Uncertain: Text from the unofficial 2008 DIPP web edition; G.S.R. number as published unconfirmed.
2010-10-07G.S.R. 821(E)AmendedReplaces 'Inspector of Boilers' with 'Competent Person'.
2010-10-28G.S.R. 195AmendedAdds a note applying HP boiler inspection to LP boilers in the same enclosure.
2015-04-15G.S.R. 286(E)SubstitutedReplaces Appendix JA.