Regulation 609 — Tests for initial qualification of a welder
Text in the DPIIT web edition
Archived copy captured 05 Aug 2022 (Wayback Machine); the same page also prints regulation 608. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
| Reg. 608, Reg. 609 QUALIFICATION TESTS FOR WELDERS ENGAGED IN WELDING OF BOILERS AND STEAM-PIPES UNDER CONSTRUCTION, ERECTION AND FABRICATION AT SITE IN INDIA AND IN REPAIRING BOILERS AND STEAM-PIPES BY WELDING Reg 608 | |||||||||||||||||||||||||||||||||||||||||||||||
Reg. 609 Tests for initial qualification of a welder
| |||||||||||||||||||||||||||||||||||||||||||||||
| Next >>> |
Earlier text: the 2008 DIPP web edition
Tests for initial qualification of a welder
(A) Theoretical Examination – A welder shall be required to answer questions on the following subjects, orally or otherwise:-
1.Electric Welder:-
(i)Weld preparation
(ii)Elementary knowledge of the working of welding equipment.
(iii)Properties of material to be welded – cold and hot working, thermal conductivity, fusion point, oxidation (for welders engaged in alloy steel welding).
(iv)Elementary knowledge of electro-technical principles, kinds of current, striking arc voltage, welding-arc voltage.
(v)Welding defects and their prevention – influence of length of electric arc, effect of excessive or too low amperage, slag inclusions, porosity finishing the surface of welding bead.
(vi)Electrodes for different types of welds and steels and joints in different positions.
2.Gas Welder:-
(i)Weld preparation.
(ii)Working of welding equipment.
(iii)Elementary knowledge of properties of materials to be welded – cold and hot working, thermal conductivity, fusion point, oxidation (for welders engaged in alloy steel welding).
(iv)Elementary knowledge of fuel gas and flame adjustments for favourable welding condition.
(v)Kinds of welds, welding defects and their prevention, welding techniques (right-ward and left-ward, welding with two torches on vertical surface, excess of gas or oxidation, preheating of base material and subsequent heat treatment.
(vi)Filler metals.
Next >>>
Amendments found
Machine-assisted list from the amending notifications (DPIIT copies; 1990–1998 from scanned Gazette issues on India Code); may be incomplete.
| Date | Notification | Part | Action | What changed (summary) | Web edition |
|---|---|---|---|---|---|
| 1969-03-01/1988-12-31 | compilation-1969-1988#p103 OCR of compilation | (b)(2) | Amended | Changes '381 mm (15 inches)' to '300 mm'. | listed before the capture |