Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 540 — Construction and Workmanship
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulations 538, 541, 539A, 539B. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
| Reg. 538, Reg. 539 a, Reg. 539 b, Reg. 540, Reg. 541
Reg. 539 a
Reg. 539 b
Reg. 540
Reg. 541
|
Earlier text: the 2008 DIPP web edition
Construction and Workmanship
The manufacturer shall supply the Inspecting Authority with a fully dimensioned sectional drawing showing in full detail the construction of the boiler for approval before putting the work in hand.
Full details including dimensions of plate preparation for the longitudinal and circumferential seams shall also be shown on the drawing.
Fully dimensioned sketches showing in details the attachment for stand-pipes, branch pipes and seatings, the position of these attachments relative to the longitudinal and circumferential seams and other opening shall also be given in the drawing.