BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)

Regulation 515 — Headers: Construction

Unofficial DPIIT web edition · not verified0 amendments found

Text in the DPIIT web edition

Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulations 516A, 516B. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.

Unofficial DPIIT web edition · archived 2022 · not checked against the Gazette


Reg. 515
, Reg. 516 A, Reg. 516 B
STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMISER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

Steel Economisers with or without cast iron sleeves on the tubes

Headers: Construction

a)

The headers shall be constructed in accordance with Regulation 154.
b) Branches, shall be secured by one of the following methods.

1) Expanded, belled and welded.
2) Strength welded with additional securing means.
3) Full depth strength weld.
4) Branches less than 2 inch bore may be screwed and seal welded.
c) Open ends of forged for seamless steel tube headers may be closed by forging, or the ends may be secured by bolting, screwing, or welding in an approved manner.



Reg. 516 A
STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMIZER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

STEEL ECONOMISER WITH OR WITHOUT CAST IRON SLEEVES ON THE TUBES

Headers: Working Pressure

(a) Rectangular headers: -

The working pressure shall be calculated in accordance with Regulation 340.


Reg. 516 B
STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMIZER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

STEEL ECONOMISER WITH OR WITHOUT CAST IRON SLEEVES ON THE TUBES

(b) Cylindrical headers
The working pressure shall be calculated in accordance with Regulations 270 and 271.
Earlier text: the 2008 DIPP web edition

STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMISER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS

STEEL ECONOMISERS WITH OR WITHOUT CAST IRON SLEEVES ON THE TUBES

Headers: Construction

a)The headers shall be constructed in accordance with Regulation 154.

b)Branches, shall be secured by one of the following methods.

1)Expanded, belled and welded.

2)Strength welded with additional securing means.

3)Full depth strength weld.

4)Branches less than 2 inch bore may be screwed and seal welded.

c)Open ends of forged for seamless steel tube headers may be closed by forging, or the ends may be secured by bolting, screwing, or welding in an approved manner.