Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 508 — Number of tensile tests
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulation 507. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
|
CAST IRON, TUBES AND HEADERS | ||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||
|
CAST IRON, TUBES AND HEADERS | ||||||||||||||||||||||||||||||
| ||||||||||||||||||||||||||||||
Earlier text: the 2008 DIPP web edition
STANDARD CONDITIONS FOR THE DESIGN AND CONSTRUCTION OF ECONOMISER, FEED PIPES, FEED HEATERS AND OTHER SIMILAR VESSELS
CAST IRON, TUBES AND HEADERS
Number of tensile tests
(a)The number of tests required for each batch of castings shall be in accordance with the following table the various classes of castings being divided into 4 representative groups:-
Group Weight of castings Test requirements
1. Up to 28 lbs One test for each 30 cwts. Of castings or part
thereof.
2. Over 28 lbs. and up to 1 cwt
One test for each 2 tons of castings or part
thereof.
One test for each 3 tons of castings or part
3. Over 1 cwt. And up to 1 ton
thereof.
In the above Group 1, 2 and 3, all castings represented by one test must be poured from the same ladle of same heat as the bar or bars provided for the test.
Over 1 ton and important One test for each 4 tons of castings or part
castings thereof or for each casting weighing 4 tons or
4.
more.
(b)Conditions for Acceptance and for Rejection:-
Test Result Conclusion
1st The batch or separate casting represented
Pass
shall be accepted.
Tensile or Transverse test fails Two more tests shall be made.
2nd If both pass The batch or separate casting represented
If either fails shall be accepted.
The batch or separate castings represented
shall be rejected.
Provided always that, in the case of failure of any test piece showing obvious casting defects, another test piece shall be taken from spare test bars or cut from a casting from the same batch and the results obtained from this substituted for those obtained from the defective test bars.