Regulation 392P

Unofficial DPIIT web edition · not verified0 amendments found

Text in the DPIIT web edition

Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulations 392N, 392O. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.

Unofficial DPIIT web edition · archived 2022 · not checked against the Gazette

Reg. 392 n, Reg. 392 o, Reg. 392 p

No stay shall be welded.



Reg. 392 o

For the purposes of these Regulations renewed parts shall be deemed to be parts of a new boiler intended for use at the pressure at which the boiler under renewal is used.


Reg. 392 p

Butt welding of Smoke tubes.-Smoke tubes may be butt welded either by fusion welding, flush welding or oxy-acetylene welding, and these should be tested hydraulically at the discretion of the Chief Inspector.
Earlier text: the 2008 DIPP web edition

REGULATIONS FOR THE REGISTRATION OF BOILERS AND INSPECTION OF BOILERS AND STEAM-PIPES

Butt welding of Smoke tubes.-Smoke tubes may be butt welded either by fusion welding, flush welding or oxy-acetylene welding, and these should be tested hydraulically at the discretion of the Chief Inspector.