Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 389 — *Grant of certificate
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulation 388. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
| Reg. 388, Reg. 389
| |||||
Earlier text: the 2008 DIPP web edition
* Grant of certificate
A certificate for the use of a boiler shall be granted in Form VI. In the certificate shall be entered the maximum pressure at which the boiler shall be worked, the load to be placed on the safety valves or the thickness of washers or ferrules required as safeguard against overloading and the date and pressure of the last hydraulic test of the boiler.
* The Inspector's remarks should be as brief as possible.