Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 25 — Facilities for inspection
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine). The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
| Reg. 25 MATERIALS OF CONSTRUCTION STEEL PLATES, RIVETS, SECTION AND BARS IN CARBON STEEL |
| The maker shall adopt a system of making the ingots, billets, slabs, plates, bars, etc. which will enable all finished material to be traced to the original charge, and the Inspector or Inspecting Officer shall be given every facility for tracing all plates and bars to their respective charges, and for witnessing the required tests. When he is satisfied with the material and with the results of the tests, he shall be furnished with two copies of the advice notes of the material for his signature. |
Earlier text: the 2008 DIPP web edition
MATERIALS OF CONSTRUCTION
STEEL PLATES, RIVETS, SECTION AND BARS IN CARBON STEEL
Facilities for inspection
The maker shall adopt a system of making the ingots, billets, slabs, plates, bars, etc. which will enable all finished material to be traced to the original charge, and the Inspector or Inspecting Officer shall be given every facility for tracing all plates and bars to their respective charges, and for witnessing the required tests. When he is satisfied with the material and with the results of the tests, he shall be furnished with two copies of the advice notes of the material for his signature.
Amendments found
Machine-assisted list from the amending notifications (DPIIT copies; 1990–1998 from scanned Gazette issues on India Code); may be incomplete.
| Date | Notification | Part | Action | What changed (summary) | Web edition |
|---|---|---|---|---|---|
| 2010-10-07 | G.S.R. 821(E) | Amended | Replaces 'Inspector or Inspecting officer' with 'Competent Person'. | listed before the capture |