Indian Boiler Regulations, 1950 (superseded 1 Oct 2026)
Regulation 112 — Local Welding of Butt Seams
Text in the DPIIT web edition
Archived copy captured 03 Aug 2022 (Wayback Machine); the same page also prints regulation 111. The text matches the 2019 capture; amendments from 2020 onwards are probably not included. Units as printed.
| Reg. 111, Reg. 112 SHELLS, ANGLE RINGS, BUTT STRAPS, ETC. Alternative Construction |
| As an alternative to the tucking of butt strap ends under the shell rings, the ends may be terminated at the edge of the shell rings or ends and electrically welded thereto. (a) The ends of longitudinal butt seams of shell rings may be welded for a length not exceeding three times the overlap at the circumferential seam, provided the butt straps are run as closely as practicable to the circumferential seam. (b) Only metal arc welding of the butt seams of shell rings shall be permitted. (c) Where hemispherical shell crowns are pressed from plate they shall be pressed to form by machine in progressive stages without thinning and on completion shall be annealed. |
Earlier text: the 2008 DIPP web edition
SHELLS, ANGLE RINGS, BUTT STRAPS, ETC.
GENERAL
Local Welding of Butt Seams
(a)The ends of longitudinal butt seams of shell rings may be welded for a length not exceeding three times the overlap at the circumferential seam, provided the butt straps are run as closely as practicable to the circumferential seam.
(b)Only metal arc welding of the butt seams of shell rings shall be permitted.
(c)Where hemispherical shell crowns are pressed from plate they shall be pressed to form by machine in progressive stages without thinning and on completion shall be annealed.