Indian Boiler Regulations, 1950 · historical print edition (OCR)
IBR 1950 — Chapter IX
OCR of DPIIT's scanned historical print edition of the Indian Boiler Regulations, 1950 (imperial units; consolidation date unknown). This is NOT the text as in force on 30 September 2026. OCR errors are expected; check the scanned page.
Scan image 1 open scan
261 | danwoe HIN ) In the case of forced flow and f i i } Le? : orced circulation t i l) * Firodeh at ill be made for checking that proper circulation is mainfatoet | | 8h ail sections of the circuit by the flow of water. finite | I CHAPTER IX : BL UN ~ 377. Hydraulic test of boi istrati mei il x . REGULATIONS FOR THE REGISTRATION AND INSPECTIONS OF hydrauli in the trace ollers for registration.—Every boiler shall mi || | | BOILERS : . : 378 ae tested in the presence of an Inspector or Inspecting Officer. = a 375. *The procedure to be followed in connection with applications for the _~..; Ereparation for hydraulic tests—(a) The — i li) le t sub ests. € chest of all m Wil registration of a boiler and with examinations of boilers under the Act shall be » yect to the steam pressure shall be in place and shut tight or blank flanged? ati regulated in accordance with the provisions of this Chapter read with the . bl (b) The safety valves should invariably be removed and the ches i | i relevant Sections of the Act. ank flanged. sha semi ii! ; : ee . The attachment fi : HHH] 376. Preparation for Inspection—(a) At every examination of boiler or (©) nt for the Inspector’s pressure gau i | | the grant of renewal of a certificate, the boiler shall be empty and thoroughly ©) All doors shall be properly jointed and jicmnae = = a “ al | clean in all its parts. Except as provided as for in sub-regulations(f) all doors of completely filled with water, care being taken to allow all air to micas IF Hil manholes, handholes and sightholes and cleaning plugs and all caps in the possible, a preliminary test not exceeding the working pressure of the boiler H| Hit * Jal leaders and mud drums of water tube boilers, all firebars, bearers, front plates shall be taken before the Inspector’s vis; : : a ) | | bridge plates, fire bridges brick arches, oil fuel burners and mechanical stoker x (ec) Whena boiler is led a ie - ha the Hightness of the joints. ; al fittings shall be removed. All valves and cocks comprising the boiler mounting cleared of lagging or brickwork; at Yt or the first time, it shall be entirely ; i] ] shall be opened up and taken apart and the valves or cocks ground, when of portions thereof, shall be removed i equent tests the lagging or brickwork, i a Hit necessary, before.the Inspectors’ visit. : moved if required by the Inspector. ! Hit oe ° ° aha (b) Provision shall if, required by the Inspector, be made for the removal J 379. Procedure of hydraulic tests.—(a) Subj ae HHI of lagging or brick-work or other concealing part and for the drilling of plates, £ regulation (e) of regulation 381, every baller shall bd yd ¢ ca anit and for verifying the pressure gauge and safety valve dimensions and weights. — of’an Inspector, to not less than twice the workin fear wh ed . (c) All smoke tubes, exterior of water tubes, smoke boxes, and external ever Bete work ASL gery 50 pounds per square ey which- flues shall be swept clean. ice | _ composite construction the test pate eters of syuen welded or * (d) Provision shall be made for the effective disconnection of all steam —4 working pressure. one-and-half times the ) and hot water communications with another boiler understeam as pec — _ . (b) The boiler shall satisfactorily withstand ; in Chapter IXA of these Regulations. This shall be effected either by the ciable leakage or undue deflection or di stand such pressure without appre- f removal ofa length of pipe from the steam and feed piping or by the insertion = consecutive minutes. If the t or distortion of its parts for at least ten of substantial blank flanges. Where blank flanges are employed, they shall be b allowable by calculation shall pies 18 not satisfactory, the working pressure l suitably reduced, unl i am a » unless the own aia extn as will enable the boiler to withstand Lacie sscrhated ep abenda is A 7 the boiler visi again be examined after the altera- ' ressure i i tested to the satisfaction of the fae ouietoarrn ane lier (c)*At the first hydraulic t i i . t est of a boiler prior to the i igi ea deflection measurements shall be Tae before ie ee lava urnace length, fire-box and flat end or other plates. Rare inserted between the flanges of the chest and the pipe attached to it. In Piatt the case of boilers fitted with welded pipe work, their effective disconnection i from other boilers may be made by fitting vent pipes on the pipe work. The Vit vent pipes which shall have bolted on flanges and not less than 2" bore shall Mit be fitted on the pipe lengths between the boilers stop valve and the imterme- Wai diate stop valve and between feed check valve and the intermediate check valve. i ) Disconnection of the boiler from the others shall be effected by closing valves mi) | | on either side of the vent’pipes and then removing the blank flanges from the Wi vent pipes. (a) After the application of the h i ii ‘ examine the boiler insi the hydraulic test the Inspector shall. carefull Wt ae No blank flange shall be inserted between a safety valve chest.and the withstood ne and outside and satisfy himself that it has satisfactorily ‘boil ee in, eh the safe working pressure to be allowed for a LCaleulation in the ordinary way, the Inspector shall, hier the den determining ote ie Ang be ee hydraulic test for the ome oF a ikea Phere pad exceed the ily Eee er pe , working iieutaane. ine Soe aie. ee Wa (f) At alternative annual inspections and subject to a minimum of three ai bottom rows or all tubes subject to the first pass of heat being opened up for i inspection the Inspector may at his discretion relax the preparation for inspec- tion called for under (a) above in favour of boilers having an evaporative Wa capacity of 200,000 lbs. per hour and over, and fed either water treated to the | satisfaction of the Inspectors. ee *Nore.—In accordance with sections 7 and 8 of the Act, Inspectors are required to nen ’ and examine boilers for registration, to examine boilers for renewal certificates, to deta subject to the approval of the Chief Inspector, the pressure at which they may be allow pe work, to grant certificate therefor and generally to convey to the owners such orders as (ne Chief Inspector may issue, : *Nore.—T : tinectin’ a. hese defection measurement: i 10n Book before its submission to ‘the Chat tee eee in the Memorandum of 260
Scan image 2 open scan
262
263
boi due deflection or indication of | .
(f} Should any Leta! tos epee the pressure shall be released of the accumulation test may be assumed to have been satisfied if the valves are,
ai Lh | = ne set et dad eent The working pressure i ed | or pare béen, sleer sha rat edch -blows at the pressure not exceeding the
Wil!) | ammediately suc ies hen the point of permanen _ working pressure of the boiler.
t of the test pressure applied when th a a
| | par gi veached. This pi bs shall apply to any boiler.at any test. (d) Before the safety valve test, the Inspector shall satisfy himself that the
Hy ,) a 5 . ination shall, except when water gauges are in working order and that the feed apparatus is capable of
i | (g) Hydraulic tests of boilers at a ener ae r the inspection. The supplying the boiler with sufficient water
' * ‘ ise, made 2! | oar 5
| itt) the Inspector vg gence onie dreary such subsequent examinations seal. | _ (e) Where the State Government does not require a person-in-charge of a
H| Hii hinge Segal nb pearter to one and a half times the working pressure o! the ) boiler to hold a certificate of competency, the Inspector may, when he thinks fit,
| | ty beg one and a q Been iselt by questioning or by practical test whether the person-in-charge
i tt ° : : F : not permit of the oi the boiler.understands the use and purpose of the water guages, the pressure
| | f ee ey ape pen ogee 8 vate be ita see it ' guage, the safety valves, the feed water-supply and blow down.
Hue ting insi oro : eiefaly ren el
HH | li | Seeman Aediatlic pteawats to one and a half times the working pressure at each (f) When witnessing safety valve test, Inspectors shall use the
| aa cn je thee the grant or renewal of a certificate. ; standard pressure guages supplied by the Chief Inspector unless the boiler
mt | pe Water tube locomotive type and all tubular boilers shall Le dyin ie agli la since the “ of inspection, been tested and found correct
BT titi i) Water tu i such tes ) with an authorized testi achine. - .
| | eaten each inspection for the grant or renewal of a certificate, unless | ing machine ae
nnn is waived under the orders of the Chief Inspector. ci cantie wad | (g) No steam guage shall be used without a syphon filled with water bet-
by | | (j) The Inspector may if he considers it necessary, apply a hy ween it and the boiler.
WE to any boiler at any inspection. — 3 { Hers which de‘not - ai (h) When the accumulation of pressure at a steam test exceeds ten per cent ||
eat k) Except in the case of small, portable and vehicular boilers boilers shall . of the maximum working pressure. the area of the safety valves shall be consi- nu
ii * ) dhe or building in brickwork, the hydraulic test of all hall after { dered insufficient, and a certificate shall be refused until the safety valve area is Hn |.
i} } eet only after the erection of the boiler in -~ and = guar ed be increased. i
i} pees ena ‘i ey wei : wk : |
ad im re-erection in a position different from that in whic sll ts a | (i) An Inspector may, when visiting a factory for any purpose, verify the
Ll 1 Hitt hydraulically tested. k increased pressure iE correctness of the safety valves and pressure guage of any boiler under steam by i
Tr yi draulic test shall also be taken before granting an increased pt hi comparision with his standard pressure guage.
1 Sn i] (1) Ahy ea repairing a boiler,unless the Chief Inspector authorizes the |
| 7 ’ | certificate and after rep : a *
: s Inspector to waive such test. ie
381. Procedure for registration.—(a) On receipt of an application for re- i|
gistration under Section 7(1) of the Act, the Inspector shall, when the boiler il
has been properly prepared for examination proceed to measure in complete Ml
détail all its parts, ascertain the working pressure allowed by the Regulations by al
making a series of calculations of the strength of the various parts, such calcula- i
____ tions being based on his measurement and if he is satisfied with the correctness of
___ the maker’s certificate, on the dimensions and other particulars relating to the i
material and construction as stated therein [vide Section 14(1) (c) of the Act Mil
and Regulation 4]. In making his calculations he shall after examination of the '
material, take due account of the workmanship and details of the construction I
of each part. In his examination the Inspector may, if he deems necessary bore 1)
the plates or other parts to ascertain their thickness and in making his calcula-
_ tions he shall be guided by the requirements of Chapters IV and V of the
Regulations.
(m) When carrying out hydraulic test, Inspectors shall use pressure gauges
supplied by the Chief Inspector.
380. *Steam tests. —(a) Every newly eT Oe Ee au beg i
ich 4] ressure has been altere r be '
Saal Gr ewe! bar ince for such boiler, be tested under steam to
satisfaction of the Inspector. . :
’ (b) At the time ‘of test the safety valves shall be left free and capable o
‘ being adjusted to the approved working pressure. __ —
| | | } (c) After adjustment of the valves to the correct blowing preene Co ho
| shall be tried under full steam and ioe: pny EGo EB fogal fas scrupulation
. pees 4 during which time the In t sare
| | of Beas Galea details of the test as well as the loading and adjustme
it the safety valves. — . tou
vali In the case of water tube boilers or boilers fitted eae rpigion Oe
it i d stop valve need not be shut off an a mene
| Pave aeoraad Hite 2 ‘ dequate by calculations, the requit :
. valve area and lift are found to be adeq Veh
(b) If no formulae or co-efficjent applicable to any part is contained in
a Chapters IV or V of the Regulations, the Chief Inspector shall in his discretion
| determine the fitness of such part.
(c) The strength of the weakest part so calculated or determined, subject to
ape any discretionary power exercised by the Chief Inspector, shall determine the
Piha , is primarily intended for the purpose of ascertaining by pres 7 Permissible working pressure of the boiler. After inspecting the boiler and
WH *Nore.—A steam test 1s primarny lieve boiler effectively of excess nspectors ‘{Scertaining by the prescribed calculations the maximum pressure at which the
iil ther the safety valves are sufficient to re king pressure is reached. T a ~ boile
Hi pore they operate at the time when the maximum wor P r
T may be worked, the Inspector shall hydraulically test and steam-test it in
nce with requirements of Regulations 379 and 380 and a provisional
“a ®t under Section 9 of the Act in Form V may be issued after the hydraulic
i : test.
should always send to the owner due notice of the date fixed for the steam
‘ ils i orandum
~ Qn. completion of the test the Inspector should enter all details in the Mem
Inspection Books.
oil
4 YM.of Indus try/ 69-70- 17Scan image 3 open scan
265 264 i Avs ' The distinguishi ; C all enter the above particulars and dimensions of the ed therefrom te iene ey be engraved above a number and separat- boiler and calculations of strength of the various parts, togeth¢r with details of and figures shall be one inch i “3 two and a half inches in length. The lette: the hydraulic and of the steam tests, in a “Memorandum of Inspection” Book the case of small boilers the lette eight and of suitable breadth, provided that in (vide Regulation 386) which, together with all the makers’ papers for the boiler, . _ of the Chief Inspector, be red sa and figures of the device may, in the discretio shall be submitted to the Chief Inspector with the Inspector’s report under sub- in a rectangle, the upper and low wel 8” in height. The whole shall be esiaed section (3) of Section 7 of the Act in Form I. one quarter inch’ clear ei ee eg ha rs be three inches apart a 4 x (c) Where a certificate in Form II and a Memorandum of Inspection Book gures respectively as indicated below: ers and the bottom of the l in Form J are fi urnished by an Inspecting Authority in accordance with sub- te ee eas ) of Regulation 4, the Inspector shall, on receipt of an application ‘ nder Section 7(1)of the Act, proceed to make such examination Q BY i he boiler as wil! satisfy him that the boiler is the one : certified by the Inspecting Authority and that it has sustained no damage in weiees j transit for which purpose he may, if he considers it necessary, subject the boiler ; 1234 i= to hydraulic test in accordance with Regulation 379. pared Reb, | es " The side li ; iq r shall. if he is satisfied with the condition of the boiler, ; nes shall be at equal ae Wiig shall not be less than yas heh in ee re from the figures. The engra- ulars and approved working pressure entered in Form I by (b) Th hority as if they had been ascertained and entered by himself 2 e engraving shall be c days of the first inspection of eee and ready for verification within thirty er to enable the boiler to be worked. » Sal Sr tetee) © ‘ , - (c) Boilers havin i : : amination of the boiler in the shall have ‘ing registry devices differing from th i : Memorandum of Inspection Book as may be required and shall submit the book with Ese presoabed ah Pb a ont and Barated is See ealty i : original numbers of such boilers sh i. | all be in | and Inspecting Authority’s certificate and drawing of the boiler with his report Desi 4 Sate etic : to the Chief Inspector as prescribed under sub-regulation (d). Be ike Sustew which ies since teen tnt, a new number shal be ome extinct, a new number shail be | , (d) The Inspector sh | regulation (¢ for registration U and measurement of t The Inspecto accept the partic the Inspecting Aut and shall issue a proivisional ord He shall make such entries in respect of his ex er.—(a) The registry’ number of every « boiler shall not be used again for another boil . Be er. * 382.*Engraving of registry numb boiler shall, within 4 period of one month after the registration thereof, be cut 7} aah Mi Hi in the front plate thereof in such position as shall be pointed out by the Inspec- , Measurement of heati tor. The device for each State/Union Territory shall be distinguished by the “9 ne he of the safety valves anid: piety fet ed purpose of regulating . eating surface” of a boil gistration and inspectic : aa oiler shall be th pection fees 4 exposed : L e total surf: posed to heat on one side and in contact with nie ee a any om re dn the water side or the fire side, whichever is larger. | following letters :— : pig eee Islands rp xt &; E eS N . i Pht ; ndhra Prades : x ey aa os ot . ae (b) For Lancashire and Corni : He Me = fs Se ft as ay 1 rnish bo : I) Sica nee Pa Ee od atin peso, oe side fi ubes where fitted, and the part of th plates, the fire Gujarat % - a ‘ "i * * 6T bylin fers Age i estimating the areas iene’ midi peaacas ll_ below the Hit erancn gl ended SPR ee ns ye tee, HP circumferencd x ths tet eg re he pear shall be taken as baer ofl nagh Hl 4 al ae me o* oe on o° * ot . wi ‘ ‘boiler bet ii taeesaive: Minicoy & Amindivi Islands .- fa + ii pe! ee set cae widths ae below the flue covers shall na ole Madhya Pradesh a oe a 7 Pee MP _ area of shell heatin - hie length between end plates shall be ak ae a8 Madras i me i . bet . 4: Me _ exposed to heat shail bé omitted fro pss of a surface of the eee wl alate Maharashtra _ am es tray iC st fi m the calculation. ; ) Manipur aa . MA 7 Example.—The f Aysore . : ., MYS | having plain fi ormula for the total heating surface cf: achi rae | het nya 2A ae — : —- ae eg eros. tubes.is as follows oh Lancashire boiler Wells Punjab .. i Rr ae I: ie ot ee i eet = 2L (3.14d+D). Li . . | pajasthan fe Bo Re : ie FF eR Sa ty in feet, d is the ea bine Meo boiler between es one i ait a id ce ae Re feet and D- is the internal diameter of the varest nae a in Uuar Pradesn ..- 26 rs ve ae a ot ; , : ell in «WBE the (c) For steam and a ao . the drum and water drums of water t i : shall be taken as half the external pal aac ba multiplied by y West Bengal. r tracing the devices in the boiler will be supplied by the Ch ee clear length of d in the boiler will OF Sor by the a , rum between the outer brick walls or centres of cross asted On the part o ea ' i *Note.—Engraving slips fo i Inspector; the slip should be p
Scan image 4 open scan
266 ‘boxes, as the case may be. The heating surface of the tubes shall be taken as 26 the external surface of the tubes between the ube plates a heaters. The 7 ; i ation. ; ; heating surface af the heaters shall be omitted rom the cale tion ; For Boiler Rating exceeding 12,000 but not é (d) For marine boilers of the fire-tube type the heating surface shall | For Boiler Rating exceeding 14.000 b exceeding 14,000 include the wetted surface of the furnaces between the tube plates (considered in For Boiler Rating exceeding 16,000 ba not exceeding 16,000 the same way as for Lancashire boilers), the wetted surface of the combustion | For Boiler Rating exceeding 1 4000 pee not exceeding 18,000 chambers (less the area of the tube holes) and the wetted surface of the tubes | ' For Boiler Rating exceeding 30.000 pai hot exceeding 20,000 between tube plates. The parts of the front tube plate exposed to heat shall be For Boiler Rating exceeding 22,000 es aa pera 4 nee : : 4 ing 24,000 400 ~ 450 500 350 600 For Boiler Rating exceeding 24,000 but not exceeding 26,000 ae Bi 650 9 oh e 700 750 800 every 2000, or part thereof, an additional fee of Rs 25 omitted from the calculation. (e) For locomotive type boilers the heating surface shall include the wetted id Boiler Rating exceedin, surface of the fire-box above the foundation ring (less the area of thetube holes For Boiler Rating exceedin and the firehole and ring) and the wetted surface of the tubes between the tube Ab : plates. The smoke box tube-plate shall be omitted from the calculation. ove 30,000 for __ Shall be charged : _(f) For vertical boilers of ordinary type the heating surface shall include : the wetted surface of the fire-box above the foundation ring (less the area of _ Provided that the Chief Inspector may di fire hole and ring and tube holes if any) and the surface of any cross or other in respect of a fresh application made in y direct that no fee shall be payable tubes and uptake below the lowest water level shown in the gauge glass. 14 of the Act. pursuance of sub-section of section (g) For Electrode Boilers the heating surface shall b calculated.as follow 386. *Memorandum of Inspecti tion Book.—(a) A Memora ndum of Inspec- : : tion Book shall be They Heating surface=—- ; ie bhi be prepared for each boiler in Fo : tor shall enter in ink all particulars and alee oF ‘the bole gina e 6 / ; _ calculations i ba aaa ‘Where E =the equivalent evaporation at 212’F under normal load, which and steam mie MAE bis tienen ts details, particulars of dri ee notes. x K.W. j ; (b) At subsequent in: i K.W. the kilowatts absorbed at the stated voltage when the water in the 3 tions hydraulic sie poiatnen ot enter the dates of the inspec- boiler has a specific resistance of not less than 200 ohms per inch tube at thereon. S, when such are made with their notes 150 F and while the boiler is delivering its normal output of steam at its working ( c) Inspectors should also enter in th e¢ Mem pressure with the feed water temperature of 60°F. the accel general condition of the boiler and of repairs, to what extent boilers Hiave (hk) No deduction shall be made for stays, etc., in calculating the heating | been cleared of brick work, etc., a r on ake it) i. of repairs, forinepection of main. phat pipes, prot poet visits for inspection (i) For any other heating surface not provided for in the foregoging | ea iit ie of Inspection Book will provide a users i pa : ior 1 procedure shall be observed. ae ses 3 story for the inf i i hp eck instructions the same gencral procedure s e observe __ quent inspections. - ormation and guidance of Inspectors at sibens (to the nearest whole figure) in the heating surface of the boiler as determined mi _ will in the case of newly registered boilers, check all particul lation 383. | oa : under Regulation 4} 2nd approve of the working pressure that is to be permitted & 26,000 but not exceeding 28,000 € 28,000 but not exceeding 30,000 orandum of Inspection Book Chief Inspector he ars and calculations _ boilers, the Chief Inspectors will examine the dianbttoe'a.tigtes. oF ean ion 385. Registration fee.—The fee required to accompany an application ; iad: under sub-section (1) of section 7 of the Act shall be :— and proposals made for repairs or reduction of «eed for the boiler should not be altered ih Ce pra: _A pressure once Rs. the Chief Inspector. ithout the written authority of For Boiler Rating not exceeding 100 .. re u ae a os 70 Bea, S87, Registra ° Vor Boiler Rating exceeding 100 but not exceeding 300. Ae i 7 dum SP inarection Reger s A pcaactenees Book or co y of Memoran For Boiler Rating exceeding 300 but not exceeding 500 .. sm E ; ll be maintained in the o ee oF th oe Matec Fequiced for registration 5 ile “yt svepeding 5 ceed a ' - > e . Vor Boiler Rating exceeding $00 but not iengoadnts 700 = ak : order: passed by him regarding the boil he Inspector in Form I and an For Boiler Rating exceeding 700 but not exceeding 900... v3 & Ook under his initial er shall be entered in the Regi tratj y Kor Boiler Rating exceeding 900 but not exceeding 1,100 me a ; i o i S. 3 21S ration For Boiler Rating exceeding 1,100 but not exceeding 2,000 +, Re ae end Chief Inspector should also see that the n For Boiler Rating exceeding 2,000 but not exceeding 4,000 ” - a ons entered in the Me For Boiler Rating exceeding 4,000 but not exceeding 6,000 mM Ik. i For Boiler Rating exceeding 6,000 but not exceeding 8,000 : ; : boil . : Eor Boiler Rating exceeding 8,000 but not exceeding 10.000 vn a mead ier a 3 me 8 i ne Memo : For Boiler Rating exceeding 10,000 but not exceeding 12,000... o : The oo pegs Saal al ee Morton o : ion 7 , m of phan of Inspection Book should always be ys be kept clean and up-to-date h except i he Chief Inspectge’ Ve actually required by the Inspector, should be filed in the office ; I ote of subsequent j
Scan image 5 open scan
| '
269
268
; . (b) Seale Oil, ete.—U; : :
Inspection Book and the Registration Book shall, on the request of the Chief’ surfaces of the exposed snetal page be iler, the Inspector shall examine all HY |
Inspector of the State to which the boiler has been transferred, be forwarded vil scale solvents, or other substances whi Higa caused by the use of water, H
to that officer who shall take over their custody and maintain them as hereim- intentionally gone in with the feed water ye ace} have intentionally or un-
before prescribed. eee eee iE be an to prevent iy farther Be Le grapes ihe
; : scale in the tubes of water- : into the
* 389. *Grant of certificate.—A certificate for the use of a boiler shall be fire of any boiler is particularly bad, ee ee or on plates over the
granted in Form VI. In the certificate shall be entered the maximum pressure (c) Corrosion, Grooving.—A gi & them to ruphite, : a
at which the boiler shall be worked, the load to be placed on the safety valves or diately adjacent to a seam is aim given amount of corrosion along or imme- H
the thickness of washers or ferrules required as safeguard against overloading, ' in the solid plate away from es serious than a similar amount of corrosion I}
the date and pressure of the last hydraulic test of the boiler and, when applica- is especially significant as Beooving oh ‘ Ea along longitudinal seams
| - ble of the main steam pipes prescribed. a gd areised. Severe So icalon : tiie edna! oe |
ulation of f : joints w. iH
300. Procedure for inspection of installed boilers.—(a) General Instrac- Baréfally for evid he water is poor,and such places should be pes sere jie it
P : ; : , : y idences of corrosive action most !
loa oi ad cance every patt ea ape is ager: Bese E Bo oreereants ;
and properly prepared Tor examination, internally and x ernally. ers ctor decides that a boiler i . 3. eT
have openings through which an examination may be made and which for fit for the pressure approved for it, Lehi witoat de ia Sats Tires 15 0 fa0per ih
operation are closed; all such parts shall be opened whether for access to water for reducing the pressure to the Chief Inspector and at hee ene proposal if
surfaces, or heater surfaces. Incoolinga boiler down for inspection Or repairs, { calculation for the wasted parts for check and ap mee) se siane sila Ts ;
until the setting 1s su ciently cooled to ; aieiin read to Whe’ pi ; P or pressure. _ it
With o the pitting and wasting of shell plates, the I |
bear in mind that shell plates may become reduce in thickness aaa if
a
ial
the water should not be withdrawn
avoid. damage to the boiler and when possible allowed to cool down naturally.
ly with ordinary prudence, to remove :
extent and still be stronger than longitudinal seams.
il | |
It is not necessary, in order to comp
of the boiler, unless defects or
All flanging shall be throughlyinspected and particularly the flanges of cir- H
Hf
Mil
Mt insulation material, masonry, OF fixed parts ;
deterioration peculiar to certain types of inaccessible parts te bees are
suspected and where there is moisture OF vapour showing throu the Mular
it covering should be removed at once and a complete investigation made. Be Reads =, cal adhd Ty apie pleas grooving in the fillet of such f
| Particular attention should be paid to the external parts of boilers in the way is very common since there is sli ik er surfaces of heads concave tg pressurn ie, |
f seating blocks, especially when es mination damp. ee oe m which produces this kind of Hufon elaine in the heads of this’ character i
engine fittings © ocomotive type boilers shou: emors Ln Leeiigast X as the OG or reversed flange pate Brains ee ol hago have what is known 1
be inaccessible to the eye, but thecondition shall be aalsctained exhtie oe on
tion
it inspection of the parts underneath at the first inspection, ant I
\| riod afterwards if the Inspector cannot otherwise satisfy himself as to ofa mirror which ata proper angle wi
the condition of those parts. Upon sufficient visible evidence or suspicion Mor euch a pla proper angle will reflect back to the eye the conditi
de to discover the true condi- place, or any other feasible manner. a
(d) Stays.—All stays whether diagona
. » wn gonal or through, shall b i
note that they are in even tension. All fastened ends Shall be [ee ean
due to age or other causes, every effort shall be me
the removal of insulating material, masonty g parts of @
le and necessary
whether cracks exist where the sta
h ays are punched or drilled for ri
and, if not found in proper tension, the Inspector should ovnioa fees
tion, even to
tting away of parts is justifi
- proper adjustment.
WAN
| boiler. Sometimes drilling or cu
i to positiviely determine this condition.
ts, go inside it and make @
tit
| The Inspector should, whenever the size permi
thorough per - all its internal parts. Before are so, he should — () Manh
isfy himself that proper provision has been made for disconnecting ~ e) Manholes and other Openings.—The : :
Should he find that proper. — a hs well as nozzles or other. oe av eg op go ee Toe
be examined internally as well as externally to see that hed are ae
ia
of course, satis
Hh the boiler from any other boiler under steam.
rovision for disconnection has not been mad
e or that the boiler ba Bi bee ‘ Maaked or defi
properly cleaned or scaled, or that is unreasonably hot, he should decline oF 4 eng? cefprmed, and wherever possible ob
roceed with the inspection and should report the facts to the Chief Inspector a the inside of the boiler, as to the Te ee ecse WAH which aot Poked
| for orders. When 4 boiler is of such a size or its construction is such that the” eet made to the boiler. All openings to external attachmer iss es eter
it not go inside it, there should be sufficient sight holes oF handholes” Wy ote connections, openings in dry pipes and openings to al dal res, shall
| ) rovided to enable him to see the principal internal parts; if any import nt noted. to see that they are free from obstructions 3 = zi ipa
Wi} part of a boiler is so constructed that the Inspector cannot examine it, he s - (f) Fire Surf: ; safari
part abel epatiey manner nee : Bien to te em Ry Bilstorioe Leaks.—Particular attention shall
3 ; a Bherve w ube sur ace exposed to the fire. The Inspector shz
. a ate which are by bulgi nh Bote ins ie boiler Ne ae deformed aiding means
Bake or tube wh g; ormer is a distortion of the entire thickness of
tion of the > where it takes place, while the latter is a laminati
the plate due to foreign material being embeded in the ‘igor beruie
|
| In the case of forced. circulation and. force v
tor should, besides tho
The plate is rolled. If bulges or blisters are of such size as would seriously
| accessible to close visual inspection, the Inspec resid 4
| examination, ensure by the flow of water that proper circulation is matte’
ed through all sections of the water circuits.
-
*The Inspector's remarks should be as brief as possible. aScan image 6 open scan
271
270
weaken the plate or tube and especially when the leakage is noted coming be pocketed: ! :
a | from those defects, the boiler shall be discontinued from service until the hamnine when the valves are closed and th
We | defective part or parts have received proper repairs. Careful observation * F action. thereby establish cause for water-
Hh! shall be made to detect leakage from any portion of the boiler structures, The arrangement of connections’
Hii) _ particularly in the vicinity of seams an tube ends. Fire tubes sometimes steam pipes shalt be especi ie aod between individual boile ;
rely collapse; the Inspector should look through the tubes for boiler due to setting or othe y noted to see that any change of tr beg
gree of distortion they piping. F outses; will ot peutiooe eet antor math on.tie
It shall be ascertai : :
ttained whether all pipe connections to the boiler possess the
Ed g,
|
such defects and if they are found with a sufficient de
i should be removed.
HH (g) Lap Joints, Fire Cracks.—Lap-joint boilers are apt to crack where the . ea
it | plates lap in the longitudinal or straight seam; if there is any evidence of leakage nge riveted to the boiler.
or other distress at this point, it shall be thoroughly investigated and, if neces- The Inspect
rivets removed or the plate slotted in order to determine whether cracks expansion a ee eS er determine whether there is ae
noted in shell plates are usually dangerous tending to c raiiatte (ae ied fp piping, and that a Lvidhapae ota Ail ioe
ubjec to it. This incl ; ration
. udes all steam and
Wn |
WW | sary
i | exist in the seam.
i except fire cracks that run from th
Ht | | i | girth scams. A limited number of such fire crac
e edge of the plate into the rivet holes of water pipe; and special attention sh
on should be given to the
blow off pipes with
ks is not usually a very s riou i ;
y y sé S their connections and fittings, | t
i use the expansion and contraction
due to
rapid changes in te
: mperature and
upon the entire bl and water-hammer acti
ow off system, which is more Soi uned bisa, great sm
a number of
i |
| H | matter. -
I ) (h) Testing Staybolts.—The Inspector shall test staybolts by tapping one blow off pi
| end of each bolt with a hammer and when practicable a hammer or other heavy off olf pipes are joined in one co tt
| ) tool should be held on the opposite end to make the test more effective: “ the ica ge i each boiler shall te yo fa The freedom of the blow
wi |: (i) Jubes—Their Defects, etc.—(i) Tubes in horizontal fire-tube boilers 4 excessive he halt ape at which time it can tana possible by opening
iit deteriorate more rapidly at the ends toward the fire, and they should be carefully to prevent corrosio: Blow off pipes should be fi pcan sadbiniwin'gg Traverse
Hitt tapped with a light hammer O° their outer surface to ascertain whether there has a) asics tee from external dampness
I been serious reduction in thickness. The tubes of vertical tubular boilers are | Hot ga Water column.—The pipin
more susceptible to deterioration at ve ais a. open Se) Pegs ie 4 ening inGpose there is no Sheaces gia teg column shall be carefully
on without water protection. ey sho e ea eam connecti ng. : aie: iii
if any, or inspected at > ES erably drain cowarde baits to the water column. : Fic vteass aa rh)
_____ the water column must drain ioeants the bole The water pipe esnioaoliont ts
s the boiler. n to i
Hit
iit! the products of combustt
i} reached as far as possible either through the handholes,
Hil the ends.
iT] (ii) The surfaces should be carefully examined to detect bulges or crackss
Hit or any evidences or defective welds. Where there is a strong draft the tubes
AH may become thinned by corrosion produced by the impingement of particles
BN of fuel and ash, oF the improper use of soot blowers. A leak from a tube
frequently causes serious corrosive action on a number of tubes in its immediate
vicinity. 5
iii) Where short tubes or nipples 4 d in joining drums or
@ headers, there is a tendency for waste products of the furnace to lodge in the
| junction points and such deposits are likely to cause corrosion if moisutre is
ih] present. All such places should be thoroughly cleaned and examined.
) (j) Ligaments between tube holes.—The ligaments between tube holes
in the heads of all types of fire-tube boilers and in shells of water-tube boilers
} should be examined. If leakage is noted, it may denote a broken ligament.
|
(k) Steam Pockets.—_Steam pockets on surfaces are sometimes found
Wi in new or replacement work, and wherever, this is possible or likely the Inspector
should make observation and, if any are found, recommend the necessary
changes.
| Wh} (l) Pipe Connections and Fittings.
a The relative posit;
shall be observ ea of the water column t
the Regulations. reo eta whether the woléiilt te loca li bo of the boiler
operating condition. attachments shall be examined ee bine te ss
eir
(n) Baffling—Wate
noted, as far ater-Tube Boilers.—In water- z ;
many types of Plone igen iat OF not te spe Matting is i ee ra
0n portions of the boi sence of bafflin zis in place. In
be Reeth ueh ergs che Det ieteeedth oe cxncant tae
ustion ar : gerous conditio fo such
are ties arrarest oe to tube surfaces shall be cate Hid Pogson of
ged so as to cause the flame to Capt ope I en
particular |
_ Part of a boil
d iler and prod i
anger of the “ibn of ‘he p eerteeating of the material and consequent
, (0) Locali
_ impro zation of Heat.—Localizati
per or defecti .—Localization ;
__ dlow pipe Auge burner or stoker ied er brought about by i
upon the boiler, shall be conde aed | operation creating a ||
(p) Suspend
‘ Suspended pended Boilers—Freedom
adit ‘ ; . of ¢
The steam and water pipes, including ‘Points wh the Supports and setting sh :Expansion.—Where boile
d for leak d if are : ere the b g shall be caref : rs are |
ned for leaks, and If any © “accumulation of oiler structure comes near th refully examined specially at .
' result of excessive strains —— ‘Produce exc of ash and soot will bind the b 1€ setting walls or floor. Oft D III
nd contraction, OF other causes. The general arrangement ind €ssive strain e boiler structu : ae
Hitler operating conditions: nn” Owns (0 the octean olde gang
s. % ; ansion of the parts
Ny due to expansion a
of the piping in regard to the provisions for expansion and drainage, as Wh
as adequate support at the proper points, shall be carefully noted. The —
location of the various stop valves shall be observed to see that water will not
{ connections to the water column, shall be exami
found it should be determined whether they are the
(q) Safety Valves
a y Valves.— S
Ments on the boi .—As the safet
oil fety valves ar most i
| iler, they shall be inspected with ine achOR Aiton. a vhore
10n,. ereScan image 7 open scan
272 | |
foreign substances located! | i . 273
tion of the valves. The
d preferably by raising. os
| (i) thatth :
e electric arc or oxy-acetylene welding sets and allother tool
: ols
le, or other
accumulations of rust, sca
should be no
terfere with th
| in the casings so as to in
| setting and freedom of the safety valves should be teste
the steam pressure to the blow-in-off point, or if this cannot be done, the ee
of the try levers to ascertain if they are free. ere , and fisher a
; plant in his ‘ :
he Inspector eh weesthe vith fade for carrying out repairs are cable foe
i
\ - shall be tested by means
discharged from a safety valve is led through a pipe £ ‘
t the time the valve is operating whether or not an drain.. (i) that th
rdance with the Regulations. : : ¢ quality of materi
kee‘ artortnedd erial used conforms to the specifications that ©
(iii) that the su ervi 4
pervisory and operational staff employed by him possess |
pipe is free and in acco
in order to determine the freedom of
should be remove iar riemeebacte state
ry training and experience for the work undertaken
the steam
| shall determine a
opening in the discharge
deems it necessary,
| :
If the Inspector
discharge from @ safety valve, the discharge connections <
| 5 30) no qeanTtie should a stop valve be permitted between a boiler and. x (iv) all welding O
its safety valve. elding Operators employed
to pass the tests i ployed by the Repairer shall b '
(r) Steam Ganges.—The steam gauges OF all boilers shall be removed and fillet Seg eneibea ae horizontal, pode es nie ap
) and the Inspector shall test them and compare their readings with a standard ' (y) standard of y the Chief Inspector, iit
test gauge. The readings of the steam gauges shall be observed and com- réquite rh Bk ork should be of high order and comply wi
ared when making an inspection with steam On the boiler, where several ton and test that may be prescribed b the Bes all the Aaa
boilers are in service connected to a common steam main. The location of . y the Chief Inspec- a
the steam gauges shall be noted to see whether or not it is exposed to high i Riveting and Other Repairs.—(c) T. ,
temperature either externally, as would be the case if placed close to the smoke nspector,— : the Repairer shall satisfy the Chief I]
flue or other high heated part of the boiler or setting, e egg to peak inter- (i) that he, possesses the n 1]
with a proper syphon or eat t ecessary equi a |
The Inspector ree and experienced workmen prs es gis an ae a
: TK under- |
B |
of
|
tection of the gauge spring
i tact with the spring. .
out the pipe leading MA
(ii) standard of work
should be of a hi
gh order and comply wi
y with all
the requirements and
test that :
Inspector, and all material used shan bo of boiler quality. ai |
nally due to lack of pro
trap to prevent steam from coming in con
shall see that provisions are made for blowing
to the steam
| gauge.
| 391. Calculation of Wasted Shell.—(a) When any part is wasted and the 7
{Inspector is doubtful of its fitness for the pressure, he shall cause one or More (d) The repairs should b .
small holes to be bored and from them. ascertain the average thickness of the = by the Inspector when the ee sapery ga ie far as his other duties : a
Hit parts from which he can satisfy himself by calculation in accordance wit the @ boilers are withdrawn, the oxes and smoke tubes of locomoti artean i
ii] . formula applicable to the part. Such gaugings and calculations he shall ae internal parts which are othe opportunity should be taken to taba Ps i
Hh enter in the Memorandum of Inspection Book. ’ Ey iecceies be bo llen eh stich inaccesible to close inspection pect the i
/ ie 4 : iler $ ' vi sts
} (b) In making calculations for a wasted part of a boiler shell, e.g-, alonS 7 “vi removing a strip of worn Bre ae LP : cited either by patching or b |
plocks of a Lancashrire boiler, the Inspector shall use the — Enis 16 peers over the longitudinal Marie ne serting the new strip sith
| oa o be not less th tt ends, the stren, th ‘
a (f) Patches for fi an that of the longitudinal joints of the Sell rises
¢ exposed plates shall be fitted metal to metal without .
: ou .
|
HI the line of seating
Pye f : . :
>
i |
it ai
wer. = = a " Equation (96)
DxF ;
; i possible, properly s F :
: ? : paced rivets wit :
gee eet eay the aie of oigerirh yee ‘: ath canals see
. riveting is i : e and the ed
gis impracticable, the plate shall be oe vat
e thinnest.
asted plate, wher
terial of shell in lbs. per, sq. in-
trength of ma
of shell in inches.
ch shall not be less than 4.
Major repairs such as fusion
392. Repairs to Boilers
i shells, fire boxes and end plates of boilers 22
j itted under these Regula-
fitting countersunk headed screw pins
(g) The thickne
thi ess of a patch plat
ickness df the plate which it is Pen is aac be less than ‘the original
(h) Bulged or di
Di cicn is r distorted furnaces i i i
istortion is not too great, be Ps Wack 10 tape: dceidee ceihe ta
(i) Circular fur
: nac i :
may be suitably vetntoread. f horizontal boilers that have become distorted
ae angles valea. ae a be of substantial section either of si
diameter and about 7 inch o back with screw stays not less tha 7 single or
© into the Furnace. the any in pitch passed through flat of a I see
, the ends being either rounded or Rigel ree ging
= é hire
nil
= where t’ =thickness of w
| }
S=minimum tensile s
11 i
D=internal diameter
| F-=factor of safety, whi
| tions, ‘the renewai OF.
i and steam-pipes, etc.» shall only be entrus
_ Chief Inspector reg i ding and other repair done
Organisation and all ot h may be determined t0.
e entrusted to any repairer 4
her minor repairs whic
minor by the Chief Inspector at his
discretion may bScan image 8 open scan
275 974 STEAM PIPES ith ferrules ‘ side and fitted with nuts at the other. : i fica be obi hate “ tandard Conditions for pc laiglcie er go ie pet not less than 1 inch in depth between furn: ir of any part of a boiler for ‘ Inspecting Authority or a recognised maker in Form THA stating that this "(k) Welding shall not be accepted for the repair inthe Regulations. Boiler has been done may be accepted. If the Inspector is satisfied With the test, the ; «) idin i forbidden for a new boiler jie iilling up of a small isolat- pipes may: be erected in Position; at the steam test of the boiler he shall par shall ac be repaired by welding eg eps ed ted edges of openings. examine them under steam pressure. No separate certificate for the steam ar j rt or the making up o ine 11 Pipes shall be issued. : ed corroded or pitted sage 0 Ment at end plates of cylindrical shells a) oF grooving i oe eo circumferential direction may be weed or in the bends of furn out and welded. -boxes and fire exposed flat i furnaces and fire- t out lat es tere rauiht fteteask and combustion chambers. may be cu plates as. : by welding. Y portions of them are d be replaced by new pieces welded in or they may be built up by an in an unsatisfactory condit in rectangu- tter to the Chief Inspector, who may require the whole of the in circular furnaces and fire-boxes and cracks in rect: I and may require any pipe or pipes to be hydraulically Bi has ard contention chambers may be welded. lar fire-boxes an ; € at such hydraulic test shall be not less than twice the (n) No stay shall be welded. or : ___ (c) The date and hydraulic Pressure to which steam pipes were subjected ded for use at the pressure at which the boiler shall be entered in the certificate for the boiler and such entries shall be con- iler intended for to be parts of.a new bo tinued from time to time in the renewal certificates for the boiler, under renewal is used. ,5--Smoke tubes may be butt welded either ) 395. Submission of (p), Burt gh eter en i oceaentil welding, ie a aaace be submit He hee peione Als at the discretion of the Chief Inspector: ilers made ;—(a) In the case of land boi : : ni or ot indi for ee he Sate in eat alate copie (b) The fee required under sub-regulation (a) shall be at the rate of reat of Tea Le er aricalaes OF men Is, design and Rs. 5.00 per 30 metres (100 ft.) of piping or part thereof inclusive of all maton ie void questions avsing at the eX ination of fittings, excepting fittings like de-superheaters, steam receivers, feed heaters and mination in advance the pla avoid questions arising at the exami reparately fired super heaters. For any fittings like de-superheaters, steam te Ane ote receivers and separators, the fee shall be Rs. 50.00 for each such fittings. ie onpeonins hi tiny of plans under shai oerbpe ae a er _ (b) The stbetih Regulation 385, subject to a rere oe ger i eee gee at ited for seruiny,aseparatefee on J 395A. INSPECTION FEES FOR BOILERS AND PARTS THEREOF aces have been suggested is oyshapaivnry ee alterations other than ; | CONSTRUCTED IN INDIA the same: scale shall be payable if the pla | L | 4 : ted. ; nee . Ps: yr aan tanec shall, after examination-of the plans and particulars c) The 3 ) The inspection fee for boilers shall be calculated on the following ap? a j d fitness ¥ - (i) atthree times the re is satisfied: with the design an 1 - . is : intimate to He PA sr rigactes te dif 6 Nop ag tartan the Lisette 4 (ii) at four time the registration fee for a boiler of welded construction. of the parts for the 1 particulars of boilers have been appro ave ° i : : ee bie ie mapiceuon shat see that the desings as approved hav : (2) Fees for HS DEREONS tor in m gistration fee for a boiler of riveted construction, of boiler scantlings shall be charged as under:— followed out and that the material corresponds with the (i) up to 10 Square feet (0.929 sq. metre) of outside surface—ail, peace yer ih Hoek . i os of egies : (i) above 10 square feet (0.929 sq. metre) of Outside surface—one half of * pee (d) The above procedure shall pera te ake. examination of hy the registration fee of the boiler for which the part is intended. ot ilers, but no fee shall b et alterations to boilers, (3) Fees for inspection of tube " such plans and particulars. : s shall be charged at Rupees Twenty onl: _ Per metric ton or a fraction thereof. : i ‘ .