IBR 1950 — Chapter I

OCR of DPIIT's scanned historical print edition of the Indian Boiler Regulations, 1950 (imperial units; consolidation date unknown). This is NOT the text as in force on 30 September 2026. OCR errors are expected; check the scanned page.

Scan image 1 open scan

ed fitting wholly or partly |

ctly to a boiler.

-pipe: ee oe ° | _ CHAPTER I

ispectively ;

. Central | GENERAL REQUIREMENTS, APPLICATION OF STANDARD
recognised pene Cen CONDITIONS AND EXCEPTIONS THERETO

3. (1) A boiler shall not be registered under sub-section (4) of Section 7

oilers constructed in any of the Act and a certificate shall not be issued under sub-section (5) of that

| g Authority in that State, section with reference to a boiler, unless the standard conditions in respect
silers constructed outside of material, design and construction, which are specified in the subsequent
a in: - ecting Authority; Chapters of these Regulations, are satisfied in respect of such a boiler.

c as agent of the owner (2) Notwithstanding anything contained in sub-regulation (1), the Chief
hired or obtained on loan ' Inspector may, subject to the provisions of ‘regulations 7 and 8, register a
Py boiler and order the issue of a certificate authorising the use thereof, under any

MES caade under the of the following circumstances, namely—

: ({) when the material used in the construction of a boiler, steam-pipe,

Sethes in internal | Economiser or superheater 1s not in conformity with the Indian
on : 2 Boiler Regulations but is known to be commonly used in other
ier tO a prime-mover or Sere ters fe eae se betes : :

1 steam-pipe; countries as being suitable for use in the construction of boilers
sd - >

and steam-pipes, provided that such material is not specifically pro-

Sto which these regula- hibited by the Regulations;

. ii) when the constructional features of a boiler, steam-pipe, economiser
i ( < : Ai 4 ete

-. ie svete or superheater are not in conformity with the Regulations but

“a zs re not considered by: the. Board to be inferior in strength to those

for otherwise to the re- are not considered Dy, Orbe inte ath to thos

prescribed in the Regulations and form part of the usual manufac-
turing practice of boilers and steam-pipes in other countries;

a (iii) when a boiler, steam-pipe, economiser or superheater has obviously
, been built in conformity with the regulations but no certificate as
s required under the regulations is forthcoming.

aa (3) No structural part of a boiler, which is subject to pressure, shall _
4 be made of Bessemer process steel or of Cast or Malleable Cast Iron.

STANDARD REQUIREMENTS

‘ __ 4. (a) Material.—All plates, rivets and bars used in the construction of
aa boilers shall be tested and found to conform with the Regulations hereinafter

pc contained.

4 { * (5) Construction—(i) All boilers during construction shall be under the
supervision of an Inspecting Officer, and shall be inspected at all stages of
; J construction as prescribed in Appendix ‘J’,

i | { (ii) Welders engaged in site welding of boilers, steam-pipes, economisers

and superheaters shall possess and produce to the satisfaction of the Chief

1 Inspector the Welders Performance Qualification Certificate issued by a Com-
petent Authority.

a (c) Certificates, etc. under section 14 (1) (c) of the Act.—In advance of

P. or along with an application for registration of a boiler the following certi-
4 ficates and drawings or specifications shall be furnished to the Chief Inspector
4 namely :—

3

Scan image 2 open scan

{ =
4 | pe
7 |) 4 in Form I in accordance with sub-regulation (c) ({) the certificates
z ¥ : : ‘vine that ’ n sub-1 n (c) (é) the ce
(i) A certificate in form II,—From an Inspecting Authority certifying tha’ | peoseribed'smnder-clagiee'(ii) andi) esd slot 62 failed to the

the material was tested and the boiler was built under their super- ‘ ) and (iy irnish

vision. Together with such certificate the Inspecting Authority | seit Inspector when application is made for registration of the

may furnish a Memorandum of Inspection Book in Form I pre- rn er es any question arise in respect of the fitness of

pared in the manner prescribed by Regulation 386 in respect at ee | e ks gers ty lsc ao igi ged: ty =H begs green
i i i tructi d th aulic | thorit

TE ee Oe OR aE ee ie eh G registration, the owner shall if requested by the Chief Inspector

test applied on completion. In case of a boiler which is to be : ‘ Bee : : :
assembled orly at site, requirement of the hydraulic test on 2 | oan and furnish the original documents specified in the said

completely assembled boiler by the Inspecting Authority shall

not apply provided that the individual parts of such boiler have In the case of steel made and tested by Weli-Known Makers
been hydraulically tested and certified by the Inspecting Authority ny in India or other countries, listed in Appendix ‘G’, the certificate
separately as required under these Regulations. of the makers in Form IV as prescribed in Regulation 26 may be

+e ; } : ted in lieu of a certificate from an Inspecting Authority in so
(ii) A certificate in form III of manufacture and test signed by the maker bigwigs é nspecting y
or by a responsible representative of the maker of the boiler con- far as it relates to testing of steel as specified in Form IL.

taining a description ofthe boiler, its principal dimensions, parti- In case where the original certificate from Well-Known Steel-
culars of the kind of material used in its construction, the thickness Makers in form IV is not produceable, owing to such certificate
of all plates, the diameter of and method of forming the rivet containing details of plates used for other purposes also, an extract
holes in the shell plates, particulars of any departure from ordi- is from the original certificate duly signed by the makers of the boiler
nary practice in making the shell such as solid rolling or welding, | and countersigned by the Inspecting Authority shall be acceptable
the hydraulic test to which the boiler was subjected, the intended | in lieu of the certificate in form IV, provided all information re-
working pressure, the area of heating surface, the maximum conti- quired in form IV are furnished in the extract.

orks ssumibee of the boiler: ag hark pet ete me | * (v) In the case of fusion welded and seamless forged drums and headers
Ee ee ee a certificate from the manufacturer furnishing the results of tests

specified in Chapter V in regard to chemical analysis, tensile, bend

Nore.—The Chief Inspector may, however, approve a modified form of certificate
and Izod impact tests.

wherein items which do not pertain to a particular boiler may be omitted.

(iit) A drawing or print to a scale, in the case of large boilers of not less In the case of fusion welded drums the diagram of welded
than # inch to the foot and, in the case of small boilers of not less repairs and temperature charts of heat-treatment shall also be
than 1} inches to the foot, showing the principal dimensions and a furnished.

longitudinal section and end view of the boiler, and bearing the

works number of the boiler and the Maker’s office stamp. The I In addition, certificates in respect of yield point at service

temperature (0.2 per cent proof stress), the average stress to

drawing shall show details of riveting of longitudinal and circum- | : :
ferential seams with pitch of rivets, cross spacing of rivet rows and | ¥ je Rana pry pects 1 per rae ieee) in Ore tee ee ee
diameters of rivet holes, the radii of curvature of dished end plates, fa diceaaterial, Shore a oece ik a ee eek in ie ours
fillets and flanges and corners of bent plates, and where gusset | . : » PEN ete BEEPS AER to be furnished.
stays are fitted the number and diameter of rivet holes in each \/ (vi) For tubes and pipes subjected to internal pressure, a certificate
gusset stay. . or = of sre ier chemical analysis, warm yield point
: . | .2 per cent proof stress), the average stress to pro an el -
In the case of water tube boilers, the foregoing scales shall apply | tion of 1 per dent (creep) I 100,000 hours and the sea and the
to the main boiler drums only, but in addition a general arrange- lowest stresses to produce rupture in 100,000 hours in the material
ment drawing of the boiler to a scale of not less than} inch to the wherever applicable, shall be furnished.
_foot shall be provided. (d) Maker's St “ am : :
er’s Stamp.— i
» (iv) A certificate in form IV from the steel maker and a certificate from in a conspicuous ponition the folowing particulars pra Bran front gale
the maker of the plates, rivets or bars, of the nature referred to in :
Regulations 26 and 27 respectively. The certificate from the maker | MAKER’S NAME
of the plates, rivets or bars, shall show the charge numbers, the | Work’s Number ................ Year of make
plate or bar numbers and the number and dimensions of the various BG Sef cbre AKC van ere ogg) culziners sw OAL att GEL
plates etc. tested, their chemical analysis, their ultimate tensile GE PECL IIR NRA USL Se Oe UST 1) 5 beara Pa a ONS. oa sew eas
breaking strength in tons per square inch of section, the percentage DM dria. coracpes 3 cei > idk 24s oats adie. ¥4 we BOS SPT onc ate 3
of elongation and the length on which measured, the number, kind |
and result of bend or other tests made and the date of tests: Inspecting Officer’s or
Provided that where an Inspecting Authority furnished a certi- ame Authority's Official

ficate in Form II together with a Memorandum of Inspection Book

Scan image 3 open scan

*

6

(e) Certificates for steam-pipes.—A certificate of manufacture and test in
Form III-A signed by the maker or a responsible representative of the maker of
the steam-pipes containing particulars and results of tests of the materials used
in the manufacture and the make tolerance within which they have been manu-
factured and the hydraulic test of all steam pipes supplied.

And, in addition, information containing results of test for the
material regarding warm yield point (0.2 per cent proof stress),
the average stress to produce an elongation of 1 per cent (creep)
in 100,000 hours and the average and the lowest stresses, to pro-
duce rupture in 100,000 hours whe1ever applicable are to be fur-

nished.

5. Modification of Formulae.—(i) Under the Regulations for determining.
the working pressure to be allowed on various parts of boilers, the material to
which the formule apply shall in the absence of express provision to the contrary
be steel complying with the requirements of Chapter Il.

(ii) Where no test certificates for plates and riyets are produced, the material
may be treated as iron, if the Chief Inspector is satisfied that the material is.
of suitable boiler quality. If in such cases the Chief Inspector is clearly satis-
fied that the material is of good quality, a higher strength than that allowed for
iron may be permitted but the strength of the plates shall not, save for special
reasons, be assumed to be more than 26 tons per square inch. In such cases
the values of tensile and shear strength shall not be more than 26 and 21 tons
per square inch for steel, and 21 and 18 tons per square inch for iron. For
iron across the grain the tensile strength may be 18 tons per square inch.

(iii) For flat plates of copper, the working pressure as found from the
formule, reduced by 50 per cent shall be the working pressure permitted.

* (iv) When the quality of material and the make of steel pipe have not

been supported by certificates from the manufacturers, the pipes shall be
treated as rolled lap welded steel pipes and the maximum permissible working
stress will be reduced by 25 per cent and they shall be presented for a hydraulic

test before erection in situ.

6. Standard specifications for materials.—The standard specifications —

for steel wrought iron and copper plates and bars,

and for cast steel shall be
those prescribed in Chapter II. :

7. Boilers not in accordance with standard conditions.—When the
standard conditions are not complied with, the working pressure of the parts
of the boiler as found from the formule in the Regulations shall be reduced

as follows:—
(a) When the certificate in Form II from the Inspecting Authority is not
furnished—10 per cent.
(b) When there are no proofs of tests of steel—15 per cent.

(c) When the workmanship is in any way doubtful, and the Inspector
is not satisfied that any of the foregoing reduction in the working
pressure would be sufficient to meet the circumstances, such per-
centage as the Chief Inspector deems fit.

8. Welding.—(a) The use of welding in the construction of boilers shalt
be permitted only where specifically provided for in the standard conditions.

7

(b) Notwithstanding anything contained in Regulation 7 hollow forged or

fusion welded drums and shells shall be constructed under the supervision of

an Inspecting Authority and shall not be accepted unless the certificates re-
quired under Regulation’4 are submitted.

Nore.—For the purposes of this Regulation, certificates issued by an authority em-
powered in this behalf by or under the law in force in © foreign de oe in
respect of boilers manufactured in that country and containing the particulars
pa oa to be specified in the certificates referred to in Regulation 4 may be
acc 2