BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Gazette figure index

Chapter 13 — Qualification Tests for Welders and Welding Operators

2 figures indexed from the official Gazette, shown as automatically extracted page crops (open the Gazette page if anything looks cut off). Where available you can download a reconstructed CAD drawing or an auto-traced outline. These are drafting aids, not verified fabrication templates: use the dimensions printed in the Gazette.

Not yet indexed in this sequence: Fig. 13/1, Fig. 13/2, Fig. 13/3, Fig. 13/5, Fig. 13/6, Fig. 13/7, Fig. 13/8, Fig. 13/9. They may share a page with a neighbouring figure or be printed without a caption; check the Gazette pages.

Gazette Fig. 13/4: ORDER OF REMOVAL OF TEST SPECIMEN FROM TEST PLATE FOR INITIAL QUALIFICATION TEST
Fig. 13/4ORDER OF REMOVAL OF TEST SPECIMEN FROM TEST PLATE FOR INITIAL QUALIFICATION TEST
View Gazette page 847
Reconstructed CAD: DXF · SVG · Preview (redrawn, checked against the print; technical review pending)
Cited by reg. 528
See Gazette page
Fig. 13/10
Gazette p.852
Cited by reg. 535