BETAIndependent engineering reference. Source-text verification is ongoing.Verification ongoing.Verification status →
IBRsourceIndian Boiler Regulations, made clear

Historical amendment to IBR 1950 — superseded by IBR 2026 on 1 Oct 2026, subject to the savings provisions

Indian Boiler (Amendment) Regulations, 1998 (G.S.R. 221)

Official text — not yet verified · OCR from a scan, expect errorsG.S.R. 221Notification dated 10th November, 1998
What it amends (editorial summary, pending verification)

Amends IBR 1950 regulations 4A-4H, 4A, 4B, 4C and 391A and the Forms: introduces recognition of Well-Known Remanent Life Assessment Organisations (sub-heading, 4A, 4B, 4C, new Forms XV-G and XVI-I) and substitutes 391A(a)(ii) and (b)(i)-(ii) on life extension of boilers, with a pressure-reduction table and NDT Tables 1 and 2.

Scanned weekly Gazette of India (Part II, Section 3(i)) of 21st November, 1998, as hosted by India Code and archived by the Wayback Machine (capture 2023-11-25). The scan also contains other notifications; only the Central Boilers Board notification is reproduced here. Reader's note: Page-5 header lines 640-644 and page headers inside the long NDT tables are included in the segments. Draft published in the Gazette dated 18 April 1998 (OCR 'IHh April') vide CBB notification No. 20(37)/95-Boilers; available 21 April 1998; no objections received. File No. 20(37)/95-Boilers, V. K. Goel, Secy. Footnote lists up to GSR 172 of 29 March 1997. Lines 1-609 contain G.S.R. 220 and Hindi.

Gazette scan (India Code copy, archived). Regulation numbers below refer to the IBR 1950, not the IBR 2026.

IBR 1950 regulation numbers appearing in the notification (includes incidental references; verification pending): 4A, 4B, 4C, 4H, 391A

Not yet checked against the official notification (read from a scan by OCR); verify before relying on it.

Official text · Gazette notification · English portion · OCR, verification status above

MINISTRY OF INDUSTRY
(Department of Industrial Development)
(Central Boilers Board)
New Delhi, the 10th November, 1998

G.S.R. 22l.—Whereas certain drdft regtidns, further to amend the Indian Boiler Regulations, 1950 were pultedThluItl by sUbSctk3ti(l) of -section 31 of the Indian Boilers Act, 1923 (5 of 123) in the Gazette of th
la ditetthe IHh April, 1998 vide the C-ential Boilers Board notification number 20 (37)J9Bdi1rs, for inviting objections and suggestions from all persons likely to be affected thereby till the expiry of a period of forty-five days from the date the Gazette containing this notification was made hvailabItbthe public; Mdwl1eras the said Gazette was piade available to the public on the 21st day of April, 1998; And whereas no objections(suggestions have been received.
Now therefore, in exercise of the powers conferred by section 28 of the Indih Boilers Act, 12 (5 of 1923),
tha'Centrth'oilSBbard hëFeby ñiakes the followin g tegulations further to amend the Indian Boiler Regulations, 1950, 4nat1iIY-

1. (1) These regulations may be called the Indian Boiler (Amendment) Regulations, 1998.

(2)They shiIl onVe'into fdrce on the ddte of their publication in the Official Gazette.

2. In the Indian Boiler Regulations. 1950 (hereinafter referred to as the said regulations), in the sub-heading to regulation 4-A to I-H for the words "and Well-known Tube/Pipe Makers." the words "Well-known Tube/Pipe Maker and Will-known 'Remanent Life Assessment Organisation" shall besub5titUtd.

3. in the said regulations, in regulation 4-A-

(i)in sub-regulation(i), fbr the words, "and Well Known Tube/Pipe Maker" the words, "Well-khowti Tube Pipe Maker and Well Known Renianent Lire Assessment Ofganisatioll" shall be substituted )in
rculatibii (2)for the words, figures and letter "Form XVA to XVF" the Words, figures and letter "Form XV-A to XV-G" shall be substituted.

4. In the said regulations, in regulation 4-13 in nh-regulations (2), For clause (ii), the following shall he suhctj-tuted, namely:--
"Where the applicants are for recognition ia '\ ii Known Material Testing Laboratory, Well Known Steel Maker, Well Known Foundry or Forge, Well Known Tube/Pipe Maker or Well Known Remanent Life Assessment fl'"1'ication. the Evaluation Committee shall inspect the laboratories of such Material Testing Laboratory and Rem:qeni Life Asessm.2nt Orunisation or the factories of such steel makers, foundo' o iorge an. luoa or pipe makers, where the testing and manufacturing activities are being earned out in ordcr to evalu; ft the p:rtormnce
quality of the t:sts conducted and products manufactured."

5. in the said regulations, in regulation 4C, in sub-regulation (2), for the figures. letters and word X\'IA to XVI f{', the figures. letters and word "XVI-A to XVI-I" shall he substituted.

6. In the said regulations, in regulation 391A:—

(i)in sub-heading (a), for item (ii), the following shall he substituted, namely: "For those boilers the plates of which have already been cut and tested shall be given a further lease of life of fifty years from the date of test of the boilers. The working pressure that shall he allowed after the testinO shall be reduced as per the table given below
Period after date of test (in years)
10
20
30
40
50
Maximum working pressure allowed (percentage) 90
80
70
50

30.":

(ii)in sub-heading (b), for items i) and (ii), the following shall he substituted, namely

(i)The boilers which are operating at a temperature of 400.0 and above including utility or industrial boilers and all boiler parts operating in the creep range of the boiler shall be non-destructively tested as per the table I iven' below after they are in operation for 1,00.000 hours for assessment of the remanent life of the parts;

(ii)The parts of a boiler when it completes a life of twenty five years are to be tested as per table 2 for asses5-ment of the remanent life of such parts. If results are acceptable as per the standards laid down by the Central Boilers Board, a certificate shall be issued by the Chief Inspector of Boilers for extending the life of the boiler for a further period of ten years or such less period as recommended by the Renianent Life Assessment Organisation. This assessment of rernanent life shall be carried out thereafter every five years by the organisations working in the field of boilers and remanent life and extension thereof afcr such organisation is approved by the Central Boilers Board. Such organisation shall work in close coordination with the office of the Techriial Adviser (Boilers) in the field of remanent life assessment and extension. The working pressure of such boilers may he reduced on the
recommendations of such approved organisation.

TABLE
I
Compo-
Visual
Ultra-
Mag-
Liquir
Replid
Samp-
Deposit Outside Fibre
Hard-
Others
nent
sonic
netic
Dye
cation
ling
Analy-
Dia-
Optic
ness
testing
partical Pene-
sis
metre
ins-
trant
and
pection
ins-
peciOn ins-
pection

(3)

(4)

(5)

(6)Drum
Yes
Yes
No
Yes
Yes
(Steam)

Water
Yes
Yes
No
Yes
Yes
drum
3011 Gi18-2
thick-
ness

(7)

(8)

(9)

(10)

(11)

(12)No
Yes
Yes
No
Yes
No
Yes
Yes
No
Yes

850
THE GAZETTE OF INDIA NOVEMBER 21, 1998/KARTIKA 30, 1920
H—SEC. 3(i)1

(1)

(2)

(3)

(4)

(s)

(e)

(7)

(s)

(9)

(to)

(ii)

(12)Low
Yes
No
No
Yes
No
No
No
Yes
Yes
Yes
temperature
header
Attemp-
Yes
Yes
No
Yes
Yes
No
No
Yes
Yes
Yes
Swell
erator
measure-
Header
ment
High
Yes
No
No
No
No
Yes
No
Yes
No
No
Temperature
Economiser
tubes
Low
Yes
No
No
No
No
Yes
No
Yes
No
No
Temperature
Economiser
tubes
Convection
Yes
No
No
No
No
Yes
Yes
Yes
No
Yes
Superheater
Coils
Primary
Yes
No
No
No
No
Yes
No
Yes
No
Yes
Non-
Super-
destruc-
heater Coils
tive
Oxide
thickness
inspe
tion
Prefinal
Yes
No
No
No
No
Yes
No
Yes
No
Yes
Superheater
Coils
Final
Yes
No
No
No
No
Yes
No
Yes
No
Yes
Superheater
Coils
Reheater
Yes
No
No
No
No
Yes
No
Yes
No
Yes
Coils
High
Yes
Yes
No
Yes
Yes
No
No
Yes
Yes
Yes
temperature
headers
Final
Yes
Yes
No
Yes
Yes
No
No
Yes
Yes
Yes
Swell
Superheater
measure-
header
ment
Reheater
Yes
Yes
No
Yes
Yes
No
No
Yes
Yes
Yes
Swell
beadezs
measure-
ment
Main
Yes
No
No
No
Yes
No
No
Yes
No
Yes
Steam
Piping

3 (i)]
M rT U1ç: MMM 2 1, 19 9 8/1fT 30, 19 2 0

851

(3)

(4)

(5)

(6)(7)

(s)

(9)

(io)

(11)

(12)Platen
Yes
Yes
No
Yes
Yes
No
No
Yes
Yes
Yes
Superheater
header
Primary
Yes
Yes
No
Yes
Yes
No
No
Yes
Yes
Yes
Superheater
header
Economiser
Yes
No
No
Yes
No
No
No
Yes
No
No
header
Anxiliaries
Yes
No
No
No
No
No
No
Yes
No
No
Boiler Bank
Yes
No
No
No
No
No
No
Yes
No
No
tubes
Water wall
Yes
No
No
No
No
Yes
No
Yes
No
No
Furnace
Yes
No
No
No
No
Yes
No
Yes
No
No
water walls

TABLE 2
Component
Visual
Ultra-
Mag-
Liquid/
Repli-
Samp-
Depo-
Outside Fibre-
Hard-
Others
nent
sonic
netic
Dye
cation
ling
sit
dia-
optic
ness
testing
Particle Pene-
Analy-
meter
Ins-
Ins-
trant
sis
and
pection
pection
Ins-
thick-
peCtiOn
ness

(3)

(4)

(5)

(6)

(7)- (8)

(9)

(10)

(11)

(12)Drum
Yes
No
No
Yes
No
No
No
Yes
No
No
(Steam)
Water drum
Yes
No
No
Yes
No
No
No
Yes
No
No
Econonliser
Yes
No
No
No
No
Yes
No
Yes
No
No
Tubes
Convection
Yes
No
No
No
No
Yes
No
Yes
No
No
Superheater
coils
Primary
Yes
No
No
No
No
Yes
No
Yes
No
No
Superheater
coils
Final Yes
No
No
No
No
Yes
No
Yes
No
No
Superheater
coils
High Yes
No
No
Yes
Yes
No
No
Yes
Yes
No
teni peratUre
headers

02
THE GAZETTE CF INDIA
: NOVEMBER 21, 1998,'1KARTIKA 30, !920
[PART 11—SEC. 3(i)]

(1)

(2)

(3)

(4)

(5)

(6)

(7)

(8)

(9)

(10)

(11)

(12)Final
Yes
No
No
Yes
Yes
No
No
Yes
Yes
No
Superheater
header
Fcononiiser
Ye'
No
No
No
No
No
No
Yes
No
No
header
Anxiliaries
No
Yes
No
No
No
No
No
No
No
Yes
Boiler
Yes
No
No
No
No
No
No
Yes
No
No
Water wall
Yes
No
No
No
No
Yes
No
Yes
No
No
Main Steam Yes
No
No
No
No
Yes
No
Yes
No
No."

7. In the said regulations, after Form XV-F, the following Form shall be inserted, namely:---"FORM XV-G
[See regulation 4A(2)]
Questionnaire to be answered by firm seeking recognition by Central Boilers Board as Remanent Life Assessment Organisation under regulation 391A of the Indian Boiler Regulations, 1950.

I. The Registered Name and Address of the firm

2. Address of the firm

3. The year in which the firm was established

4. (a) Whether the firm is recognised by the central Government or by State Government

(b)If so, furnish particulars of recognition

5. Name and address of branch or associate firm, it any

6. How long your firm has been functioning for Reinanent Lite
Assessment of boilers and Boiler Parts

7. Equipments or machines available in the Laboratory for carrying out the non-destructive or destructive testing
. Type and range of tests carried out by the firm

9.
Details of testing personnel and their qualifications and experi-ence

10. Are you prepared to conduct the testing of specimens strictly as per the requirements of the Indian Boiler Regulations, 1950

11. Has your request for regognition as an approved organisation been rejected by any authority? If so, please give details

12. Are you prepared to issue the certificates for the tests recommen-ded in the forrn9tq of the Tndian Boiler Regulations
SIGNATURE & SEAL
Noie:—The recognition is valid for a period of three years only which is renewable For three years on fresh assessment."

8. In the said regulations, after Form XVE-H, the following Form shall be inserted. namely:-

21,1998j1f
0,1S20
853
FORM XVI-1
[See Regulation 4C (2)]
Serial No.
National
Emblem
CENTRAL BOILERS BOARD
CERTIFICATE OF APPROVAL AS WELL KNOWN REMANENT LIFE ASSESSMENT ORGANISATION This is to certify that after evaluation of the inspection and material testing system of the following firm, the Central Boilers Board has granted recognition to it under sub-regulation (2) of regulation 4C of the Indian Boiler Regulations, 1950 as a Well Known Remarient Life Assessment Organisation.
MIS.
This certificate is valid for three years, i.e. u
Approval
Certificate No.–
Date of Issue
Secretary'
[File No. 20(37) 95-Boilers]

V. K. GOEL, Secy., Central Boilers Board
Footnote:—The principal regulations were publisSed in the Gazette of India as S.R,O, 600 dated 15th September. 1950 and last amended vide Gazette notifications:--

(i)GSR 178 dated 24th March, 1990:

(ii)GSR 179 dated 24th March, 1990
(Iii)
GSR 488 dated 9th October, l993;

(iv)GSR 516 dated 23rd October, 1993;

(v)GSR 634 dated 25th December, 1993;

(vi)GSR 107 dated 26th February, 1994;
Errate GSR 223 dated 14th May, 1994;

(vu)GSR 250 dated 4th June, 1994

(viii)GSR 402 dated 13th August, 1994

(ix)GSR 427 dated 20th August, 1994;

(x)GSR 562 dated 12th November, 1994;

(xi)GSR 607 dated 10th December, 1994;

(xii)GSR 83 dated 25th February, 1995:

(xiii)GSR 93 dated 4th March, 1995;

(xiv)GSR 488 dated 9th November, 1996

(xv)GSR 582 dated 28th December, 1996

(xvi)GSR 59 dated 25th January, 1997;

(vii)GSR 117 dated 1st March, 1997;

(xviii)GSR 172 dated 29th March, 1997