Historical amendment to IBR 1950 — superseded by IBR 2026 on 1 Oct 2026, subject to the savings provisions
Indian Boiler (Third Amendment) Regulations, 1996 (G.S.R. 582)
Amends IBR 1950 regulation 4 and Forms: substitutes the provisos in regulation 4(c)(iv) to accept Well-Known Steel Maker (Form IV-A) and well-known tube/pipe maker (Form III-D/III-F) certificates in lieu of Inspecting Authority certificates, inserts Note 3 in 4(g) accepting endorsed photocopies of Form III-C; substitutes the test paragraph of Form III-C, inserts Forms III-D and III-F, and substitutes Form IV-A.
Scanned weekly Gazette of India (Part II, Section 3(i)) of 28th December, 1996, as hosted by India Code and archived by the Wayback Machine (capture 2023-11-23). The scan also contains other notifications; only the Central Boilers Board notification is reproduced here. Reader's note: Regulations 4A to 4H cited as a range (OCR '4e\ to 414' / '4A to 411'). Draft published 15 June 1996 at pages 1104-1107(?) under a notification whose number/date is illegible; Gazette available 2 July 1996; no objections received. GSR printed as '58.' by OCR. File No. 6(5)/95-Boilers, V.K. Goel, Secy. Footnote lists amendments up to GSR 488 of 9 Nov 1996. Lines 1-552 are other material/Hindi; page-6 header lines 610-613 excluded.
Gazette scan (India Code copy, archived). Regulation numbers below refer to the IBR 1950, not the IBR 2026.
IBR 1950 regulation numbers appearing in the notification (includes incidental references; verification pending): 4, 4A, 4H
Not yet checked against the official notification (read from a scan by OCR); verify before relying on it.
MIN[STRY 0!' INDUSTRY
(Dtpatmcnt of Industrial Dcyclopiett 1)
(Central Boilers lloaidt
Nw Delhi, the 13th December, 1996
G.S.R. 58.--\Vhercas certain draft regulations, further to astcod the Indian Boiler Rc.ulalintc. 3 95(s, orre puhIishd LLS re-
quired by sub-section (1) of section 31 of the Indian Boilers Act, 1923(5 of 1923) at pages I 104 to 11;-,17 of 1h Gazette of India, ['art. It Section 3, Sub-section (i) ,dated the 15th Tune, 1996 under the notification of the Government of India in the 1iistr,' of Insjustn' (De-partment of Industrial Development) (Central Butlers Board) No. 0 iF. 21, clatnil tw 31,t fyi tv, 991/ in"i:init ohjcciions and
sugcstions (coin all persons likely to he affected thereby till the expiry of a period of tort)' five days Corn the d:ite os whict cot', i.s
ot the Gazette in which the said notification was published were made available to the public; And whereas the said Gazette was made available to the public on the 2nd day of Jul. 1996: And whereas no objections or suggestions have been received,
Now,thcrefore, in exercise of the powers conferred by section 28 of the Indian Boilers 1ct, 1923 (5 of 923), the Central
Boilers Board hereby makes the following regulations further to amend the Indian Boiler Regulations, 1950, nancly
I. (1) These regulations may be called the Indian Boiler (Third Antctidment) Regulatiocs. 1996.
(2)They situ11 come into force from the date of their publication in the Official Gazette.
2. In the Indian Boiler Regulations, 1950 (hereinafter referred as )ilC said regulations), in regulation 1, () in sub-regulation (c), its clause (iv), for paragraphs 3, the following shall be substituted, namely , :— -'Provided further that to respect of the steel made and tested by Well-Known Steel Makers recognised by the Centrol Boilers Board in the manner laid down in regulations 4e\ to 414, a certificate of Well-Known Steel Maker in fornt (V A shall be accepted in lieu of a certificate from an Inspecting Authority
Provided also that In respect of the tubes/pipes made and tested by weil known tube/pipe maker recognised by INc Central Boilers Board in the manner as laid clown in regulations 4A to 411, a certificate of manufacture snd test of well known tube/pipe maker in form Ill D or III F,as the case may be, shall be accepted in lieu of a certificate front an Inspecting Authority;"
(ii)in sub-regulation (g), after Note 2, the following note shall be inserted, namely :--"Note 3. Photostat copy of the certificate in Form III C shall be accepted provided it is endorsed by the manufacture, or the Inspecting Authority."
3.
In the said regulations, in Form IIIC, for paragraph beginning with the words, "The part has been designed" and ending with the words, "whose signature is appended hereunder", the following paragraph shall be substituted, namely --"The putt has been designed and constructed to comply with the Indian Boiler Regulations for a working pressure of.......... and satisfactorily withstood a hydraulic test using water or kerosene or any other suitable liquid to a pressure of........ on the ..............day of. .........19 ..........in the presence of our responsible representative whose signature is appended hereunder."
4.
In the said regulations, after Form 11IC, the following forms shall be inserted, namely "FORM 111 D"
Certificate of Manufacture and test
[Regulation 4(c)
CertificateNo.......................................................................................................... Dateof Manufacture................................................................................................... Nameof Part.......................................................................................................... Maker's Name and address.............................................................................................. Code of Manufacture/Specifications.................................................................................... Material
HeatNo............................................................................................................... Process of manufacture.................................................................................................. Fully killed/rimmed/semi killed.......................................................................................... Chemical composition.................................................................................................
Pires
l\ain dimcusion
.
Tolerances
Mode of ntanufacture
.
ldcritittcatioii marks
.
Bend Test
.
Bend test on sveld
Flare test
.
Flattening test
Drifttest............................................................................................................. Tensilestrcnth ....................................................................................................... Crushing test. . .
Heattrcatirient......................................................................................................... Flangetest............................................................................................................. Finalhydraulic test..................................................................................................... Non-destructive eaamination............................................................................................. Certified that the particulars entercd herein are correct.
The part has been manufactured to comply with the Indian Baiter Regulations at our works above named and satisfactorily with-stood a water test Of. ...............on the..............day of..............I ............in the presence of our responsible re.presentatis e whose signature is appended hereunder.
Maker's Representatise.
Maker......................
(Name and signature)
Note
In the case of pipes made from tteel, made and certified by Well-known Steel Makers in India or other countries, particulars regarding the'material' as certified by them (in any form) shall hc noted in the appropriate columns or paragraphs in thks certificate.
FORM 111 F
(Certificate of manufacture and test)
[Regulation 1(f)
Muker's Name.......................................................................................................... Code cf ManufactureJSpcciflcations....................................................................................... Material
HeatNo............................................................................................................... Proccasof Manufacture.................................................................................................. Fully killed/rimmed/semi killed........................................................................................... Chemicalcomposition................................................................................................... Tubes
Process of manufacture.................................................................................................. Maindimcosions....................................................................................................... Toleranecs............................................................................................................ Tensilestrength........................................................................................................ Elongation percectage................................................................................................... Bendtest ............................................................................................................. Flatteningtest.......................................................................................................... Crushingtest........................................................................................................... Havetest.............................................................................................................. Flangetest............................................................................................................. Bondtet on weld ..................................................................................................... Bulging test and drifting test
(for copper and brass)................................................................................................ Heattreatment......................................................................................................... Hydinulictest.......................................................................................................... Non-constructive exiuniriat 10 11.
C:crtiiicd that IjiC ps ticulars eiterei herein are correct.
The Tubes have been I1IUILLIPCtIJI ed to comply with tho ldin t3oitcr Regutatinsit at our woks iihove naneel and satisfactorily withstood a water test oC..............tin the. ...............day of.................................'i the presenence of our responsible rep•ese'itati'; whosc signature is iinpende(! hereunder. Mal:er's Itepreccotative
Mukc'.....................
(Name and signature)
Note : .. Tn the Case of tbcs made Porn stet, made and certified by the Vell-known Steel Makers in ludla or other countries, parti-culars regarding site 'material' as certified by them if anY form) shall he noted in the appropsdate columns or paragraphs in tt,s certificate''.
In the said regul.ittions, for Form IV A, the follon lag ahall be substituted, nmnIy I'ORM IV A'
( ERTIFJCATr OF MANtJFACTUP,E AND RhSUI rs t1 TLS I S
IN LJEU OF FORM TV
[Regulation 4(c) (k.)J
it is hereby certified that original steel Maker's certificate in Form IV contain following irit'oi mation in icspCct of the miucria' II ret
ti the manufacture of the boiler or parts thereof bearing Maker ,, Number . ............Simple and according to Drawing Number Fart of
Ounotity
Cast/Heat No. Plate No. Steul Making Process
Specification
Dco.sidtion
Iloiler
2
3
4
5
Name of Steel Maher/Part Test Price No. Certificate No. & Date Length BreadUh,'O.L.
Heat Treatnueuut
Maker
Thickness
1
2
3
4
S
Chemical Analysis
Y.S. (Kg! mm 2) U.T.S. (Kg/mmi) Elongation '<,O.L.
Bend Test Remarks
C Mn P S Si other alloy-
ing elements
(,)
2
3
4
5
Official Seal
Inspecting Authority'
File No. 6(5)/95-B0i1crsj
V.K. (lOLL. Sec).
Fnotnotc : .. The Principal regulations were published in the Guujettc 01 India as S.R.O. N. 00 dated 15th September. 1950 and bust amended vide Gazette notifications numbers - -
(i)GSR 178 datcd 24th March, 1990
(ii)GSR 179 dated 24th March, 1990
(iii)GSR 488 dated 9th October, 1993
(iv)GSR 516 dated 23rd October, 1993
(v)GSR 634 dated 25th December, 1993
(vi)GSR 107 dated 26th February, 1994
(Eratra GSR 223 dated 14th May. 1994)
(vii)GSR 250 dated 4th June, 1994
(viii)GSR 402 dated 12th August, 1994
(ix)GSR 427 dated 20th August. 1994
(x)GSR 562 dated 12th November, 1994
(xi)GSR 607 dated 101h December, 1994
(xii)GSR 83 dated 25th Feburary, 1995
(xiii)GSR 93 dated 4th March, 1995
(xis) GSR 488 dated 9th November, 1996