Indian Boiler (Amendment) Regulations, 1993 (G.S.R. 488)
Amends IBR 1950 Chapter XIV (regulations 618 to 622) and adds Form XVII: substitutes a new Chapter XIV 'Small Industrial Boilers' covering scope, definition, permitted variations, valves and fittings, and registration/operation, and inserts Form XVII (certificate of manufacture and test for small industrial boilers) after Form XVI-G.
Scanned weekly Gazette of India (Part II, Section 3(i)) of 9th October, 1993, as hosted by India Code and archived by the Wayback Machine (capture 2023-11-23). The scan also contains other notifications; only the Central Boilers Board notification is reproduced here. Reader's note: Notification printed 'New Delhi, the 21st September, 1993' (G.S.R. 516's footnote calls it Notification No. 6(10)/90-Boilers dated 20th September, 1993). Text runs over Gazette pp.1740-1743; p.1741-1742 are two-column with interleaved lines (pressure gauge / safety valve text jumbled) and an unreadable figure (lines 837-843); Hindi version occupies page 7 (lines 1077-1325) and is excluded. Signed '[File No. 6(10)/90-Boilers] V.K. Goel Secy.' with footnote citing G.S.R. 178 and 179 of 24 March 1990. Draft: G.S.R. 137 dated 24 Feb 1993, Gazette 13 Mar 1993 pp.415-23.
Gazette scan (India Code copy, archived). Regulation numbers below refer to the IBR 1950, not the IBR 2026.
IBR 1950 regulation numbers appearing in the notification (includes incidental references; verification pending): 618, 619, 620, 621, 622, Chapter I, Chapter II, Chapter VI, Chapter XIV, Form XVI-G, Form XVII
Not yet checked against the official notification (read from a scan by OCR); verify before relying on it.
MINISTRY OF INDUSTRY
(Department of Industrial Development)
Central Boilers Board
'
New Delhi, the 21st September, 1993
G.S.R. 488—Whereas certain regulations further to
amend the Indian Boiler Regulations, 1950 were publialied as
required by sub-section
(1)of scCtion 31 of the Indian
Boilers Act, 1923
5 of 1923) at pages 4I5-23 of the
Gazette of India, Part 11, Section 3, Sub-Section (i) daed
the 13th March, 1993 under (he notitication of the Govern-
ment of India in the Minisiiy of Industry (Dparmcnl of
Industrial IJevclopmcnt) (Central Boilers Board) No, G.S.R.
137 dated the 24th February, 1993 inviting objCciionand
suggestions from all persons likely tp be affectcd thereby till the expiry of 45 days from the date on which copies of thr
Gazette conairting the said notification were made available
to the public,
And whereas the said Gazette was made available to the
public on the 18th March, 1993,
And whereas the objection-c and sugge-stions received from
the pubic were considered by the Central Boilers Boat cI;
-
Now, therefore, in exercise of the pocscrs conferred by
section 28 of the Indian Boilers Act, 1923 (5 of 1923), (lie
Central Boilers Board hereby males the following regulations
further to
arncsct the Indian Boiler -Regulation,;, 1950.
namely :-
1. (1) These regniations may be called the Indian Boiler
(Antendmcnt) Regulations, 1993.
(2)Thoy shall come Into force on the date of their publi-
cation in the Official Gazette.
2. In the Indian Boiler Regulations, l950—
(a)for Chapter XIV, the following Chapter shall be
&ubstitiited, namely
"Ck{ArPTER XIV
(Regulations made under clausea (a) and (:ta) oI
section 28 of the Act)
SI1IJSLL INDUSTRIAL BOILERS
GENERAL
fhsirr
ie
sirfr
fir
rfrcft arr f'tsrur if W';r77l
BrrT frer?sr
ISTcT Iw'tersff wTTr
f9-
UT fl17713 ZMT slft rT, 'ta at rer
try" vs'
'tr rt'sr'ts4 I
ffr8Tr wfasrf
tlrsisr srfioFft ir TRTWX
aif
s.
sfispr,
ffrVW
fkiine fcl'r
1 a firer, 1050 r e-(. w r. Pr .
VW 600 rrr ks aft 4 sr'teiultrr ?
24 zni 1990
M. qrr fla. thT 175 W 170 TM tfr'lfistr frzp
STIlT I
618. Scope—This Chapter allaH apply to the design, con-
struction, lnrpecsioi rest:atlon, operation arid maintenance
of triiulj industi il boilers.
619. Defiriiticsn.—In this Cluspler, "Small Industrial lloilnr" me anfi
(a)a shell typo boiler generting steam for use external
to itself tinder pressure upto 7 kgcns 2 and having a
volumetric capacity exceeding 22.75 litres, but not
exceeding 500 litres including the volumetric capa-
city of all pressure parts being heated from the same
heating source and connected to the boiler; or
(b)a coil type, boiler or a once through bohr or a water
tube boiler having the conditions specified in claue
(a)above except that-.--..
(I) the limitation of pressure shall be 12 kgjcnt', and
(11)the capacity shall be not exceeding 150 litres.
Provided that In ca-se of boilers having combined features
of clauses (a) and (b) the working pressure shall be restricted to 7 kgcmi and the volumetric capacity of partIcular pressuls
parts thall not exceed tho limits specified In the respective
clauses above subject to an aggregate of 500 litres
620. B.x'ent to which variation from the standard condi-
tions laid down in the preceding Chapters is permi5sible.-
The following variations from the -standard conditions laid
down In the preceding Chapters shan be pei'mitted, subject to the conditions agecified below, with due regard to the
than full size Lind then drilled, reamed or finished
safety of the boilers and personnel:—
full size with a rotating cuttcE The sharpedges
and chips removed, the plates and butt straps re-
Materials,—(a) Tile materials used in the construe-
assembled metal to metal with pins fittings the
lion of Small Industrial Boilers shall, except as
holes and with tack bolts.
otherwise provided hereinafter, conform to the pro- (3) Insction and testing;— visions made In Chapter II of these aegulations.
1) Steel plates used in the constructiost of the boilers
shall be of IS 2062 grade B or C or eqwvatcnt
and the [late for shell and heads shall be not less
than 6 oust, in thickness and the heads as tube sheets
for tubes rolled in shall be at least 8 miss, in thick-
ness.
(c)(i) 1-leads of parts of boilers when not exposed to
direct impact of flame may be mode of cast iron
or malleable iron provided they comply with other
requirements of these regulations.
(ii)'I he aliowsble stress on cast iron or malleable iron
shall be based on the tensile strength of material
with a factor of safety of not less than 4.5.
2) Design, construction, svorkmaisstiip and the method
of computing the maximum allowable working
pressure;
(a)(i) The construction except where otherwise speci-
fied shall be the same as those prescribed in the
relevant provisions of the preceding Chapters of
these regulations.
(ii)In the case of fusion welded boiler neither stress
releving nor radiography of welded joints is re-
quired.
(b)(i) In
the Small
Industrial Boilers
unttanped
steel tube plate may be inserted into the shell and
wvlded for the entire thickness as shown in Figure
XJVJ I below with a fillet weld having a throat
not less than 1.1
14 times the thickness of the
shell or tube sht whichever is smaller.
(il)The minimum thickness of unfianged welded tube
sheets shall be 10mm.
a 'rrta.3 a"1 urRzr Tuit:i,; OF s
.3t5i.L
s1E5 1.53.3 T:t.Lt
t.2
t 5 ott
,rCiot TaA
t,
(all) The temperature of the heating element of clectri-
co.Uy heated s'teazn boilers shall be.so controlled
that it shall not exceed 6500 C.
(c)(I) The tubes shall be made of steel.
(ii)The tube holes sha'l t'e.dpilled full mjze N01 shells
butt straps and ends bolted tip in position or may
be punched at least 13 mm smeller in diameter
The Small Industrial Boilers shall be subject to inspection
during construction and after completion by an Inspecting
Authority. The inspection of the boilers shall be made at
ttic following stages
A. Shell type Boilers
ii) Material idetlfica(iort and inspection
till lit' pectior of each component after completing tc'cld-
ing and drilling.
(ill)Assembly of boiler,
(is)Hydraulic test
a) Every completed boiler of
riveted cont ruc.tiôn
shall at tested hydraulically at least twice the
working pressure;
(b)In case of a boiler wholly or partly welded cons-
truction the hydraulic test pressure shall be equal
to two times the rna,xinawn allowable working
pressure of the hoticr.
(v A test coupon shall he providCd by 11w maker for
ctltlucting root and faco bend tests.
I
B Coil type Boilers, once through boilers and water tube
hnilirc
(i)Iskntificalion of materials.
(ii)Hydraulic test—The pressure for hydraulic lest shall
he too times that of the working pressure of the
boiler,
(4)certificates tuid Maker's stamps,—
(a)The certificate and maker's stamp shall be in coo-
forrnrlhy with the provisions of Chapter 1 of these
cg LilU I ions.
(h)If owing to small size of the boiler all information
cannot he visibly stamped on the boiler plate,
n.ker's ceretificttle accompanying the boiler shall
contain the necessary details, but in all case, name,
works number and the year of the make must be
stmintpcd or exhibited on the boiler,
621. Valves, Gauge-I, Fittings and Feed Supply—
(a)Washout Plugs, etc, fi't' cleaning-
(i)Every boiler shall he fitted with at least 3 brass
svash pirips of roticcs thtt 25 mm. diameter which
shall be scrwcd into tile openings in the shells
near the botloan. In the boiler, of clostd system
type bested by removable internal electric beating
elements, the openin.g 'for these elements when
suitable for cleaning purposes may be substituted
for wash ollt ope'nliigs.
('ii) Boilers no' esreeding 300 urn, internal diameter
may have two 25 null, openings for cleaning one
of which may he used for the attachment of the
blow off valve. The openings still be opposite to
each. other. w'tmerever.possible All, threaded open
logs In the boiler shall be provided with rivettcd
or welded reinforcement, if necessary, to give four
full threads ther&in.
(iii)Electric boilers of a design employing removable
top cover flange for inspection and cleaning need
not be- fitted wjtb, washow poings and Wnshput
plug. Level gusges are not required for once
1742
THE GAZETTE OF INDIA OCTOBER 9, 1993/ASVINA 17, 1915
PART II—Sgc. 3(i))
(b)Every boiler shall be provided with atloast one feed
(iv)Preaure Gauge.—The steam pressure gaste shall
pump or other feeding device except where it is
have its dial graduated to not less than twice the
csnected with a water main carrying pressure
to
maximum allowable
woikin,g
presaura o(
the
feed
the
boiler or where
the
steam generator
is
boiler. The diameter of the thai shall be 'at least
operated with no cylruclion of steam
IciOsCil sy-
lOt) mm.
and
the
pipe
ct,r,nectincz
the pressure
tern). In the latter case, in lieu of the feeding device,
gauge shall be millirnunl
10 euro,
lard the con-
a suitable connection or opening shall la provided
tcetcri shall
be
through
siphon,
to feed the boilers. Such connection shall
be not
less than 13 mm. in diameter,
(v)Safety Valve—Each boiler shall be equipped with
tel Subject to the provisions of this sub-reguhiti.n cicry
two aiifc'ty valves for relieving the steam pressure.
boiJr shall be fitted with necessary mountings
tin,ij
The diameter of the valve shall not be less than
fittings as provided In chapter VI of these regulations,
19 mm.
and they srahl be of substantial conslrstctiou SULt'able
for 13 kgsçrn 5 , All these fittings except safety vats cv
-
The inininluin
rehieviog capacty
of
file
iet
alve
shall
be certified
by manufacturers of the
Otthigs
shall he sufficient to discharge all ilic steam that
themselves,
can
h- arnr'nit-et hv tia- boiler svithiniil alloving i Feed pipe—The feed pipe shall be provided with
a check valve and a stop valve of a size not less
than that of the pipe. The feed svatci may be
delivered to the boiler through the openings of
the seine size in the shell as that of the blow off
connection.
(ii)Blow Off—Each boiler shall be equipped with it
blow off connection, not less than lii inns, in size
located to drain the boiler water from the lowest
water space practicable when the boiler is under
pressure, Feed water shall not
be introduced
through the op.nings or connection needed for
the staler coliurin, the water gluige glass or the
gauge cock.
(iii)Water Gauges,—Every boiler other than a cull tpc
or a once through boiler shall be fitted with two
gliuc glasses not less than 150mm, long for deter-
mining the water level. The boiler shall have the
lowest visible part of the water gauge located
at least 25 mm. above the lowest pernii'aible wutcr
level.
The lowest permiseible water level of vertical boi-
lers shall be at a point one-third of the height Ct'
tho shell above the bottom head or tttbe vhett,
where the boiler i5 equipped with internal fttrnce,
the water level shall not be less than one-third of
the length of flit tubes above the top of the
furnace tube 6hect.
the pressure to rise more than 10 per wet above
maxalnum allowable working
prcrsure. The
safety valve shall
be conitceted
to the boiler
independently of any other steam COtirCctiOiS',
without ialy snnnecessrri'y intervening pipe Or fitt-
ing. Such intervening ppe or fitting ;f ttntivotit-
able thull he not longer than bc eo.'re'ponading
Price to face dimension of it tee fitting of the same
diameter and the minimum opening there through
.'Jrfl be at least equal 10 the valve inlet.
No valve of any 'descrhption shall h placed between
safely valve and the boiler not on th (t!vch;trge
pipe from the safety valve to the stniosplscic.
The electrically heated boilers shall be effectively earth-
ad with it lead of substantial
ial cross section,
622. Rttists'ution, Operation and Maintenance
(a)The fee required to accompany all applicrilon under
sub-section (1) of scetion 7 of the Act shall be
Rs. 100 per boiler. Annual Inspectlo fee shall
he Rs. 100.
hi The certificate of manufacture and test for small
industrial boilers shalt he furnished in Form XVII
appended to these regutlatioiss.
c
Operator for thcc boilers shall be all pass in Class
X or equivalent.
(b)aflcr Form XVI-G, the following Form-hall be added, namely "FORM XVII
CERTIFICATE OF MANUFACTURE AND TEST FOR SMALL INDUSTRIAL BOILERS (MANUFACTURED UNDER CHAPTER XIV)
1. MakersNam
.
-
----
--
--•-
..__YcarofMac
--'
'-- -, -'
2. Manufactured for -- ------ - .-_.
-
3. Location of Installation
- .--.----
- 4. Boiler Identification—.--------------- - -- - Inspecting othcet's Stamp ------- . - -- - - 5. Drawing No.—.--.-------.------. Alteration No.--.----------- -------- - - - - - - - - -' 5 \. Design Cod --.-.
\VorkitsgPrescurc (Kut'Cns2
- -- -- -
--
6. Size of Boiler
Length (Metres)
Width (Metres)
Height (Metres)
Diameter (Metres)
7. ShrIl Furnace/Tube Plates/Flange Details
Material Spifteation CHEMICAL C)MPOSITlON
MECHANICAL PROPE1T1ES
C
SI
Mn
P
S
S
U.T.S.
EL -- ----------- -.------.--.-- - Furnace -.---.---.--' -------•----- -'-.----.-.'--.- Tube Plates -.------ -----------• -•---- --•- Flang ---------------- - -------•------------ Boiler Tubes/Pipe./Pads Details-- -.----.--- .•-------------- - -- --- .- -- - -----' - - - -- - - - - Diameter Thickness Material Speciilcutiou
Chemical
Composition Mechanical Properties
C Si
Mn P
S
Y.S. U.T.S. EL
Tube- , -_--_,---.----.-----------.---.------------.------.-------.---"---.-----------.--- -----------------'-------- ----S-- -- Pipes ------ -------- --.---- ...----,---,------.----_------ - Pads 8. Volumetric Capuclty-------------.-------------------.----.------ ._ ._
-
- --
9. Heating Surface (Sq.
10. Nozzle Connection (a) StesmOutict ----------- (No,
Size
And Typc of Nozzles) (b) Safety Valve - ----------------------•-- - -
(No
Size
And
Type of Nozzles)
(c)Auxilla'
(Air Vent)
(Size' And Type) (d) BlowoffVaive ---..-- '--.- - ----- ------ -------------------------- - -,.-.-'- - (No. Size and Type of Nozzles) (e) Feed Valve .--.---.--------.-----..--.---.----.---.----.----.----- (No, Size and Type of Connection) It. ShopHydroTest Pressure (Kg,. cnl)---_----------___ . __. - Date ___. - - - - --- - --- - - Signature of Manufacturer
We certify that the above boiler constructed under oursupetvision and inspected aivarious sta9es of construction by the inspecting officer
and that the Construction, workmanship were satisfactory as per Indian boiler regulations. Inspecting officer Signature of Inspecting Authority Datecl-------.----.------- - - This-- --.-.---- - - - - Day of— ---------.- —19 [File No. 6(10)/90-Boilers]
V.K. GOEL Secy.
Pootnotc:-ThePriocipal regulations were published as S.R.O. No. 600 dated l5thSeptember, 1950 and last amended v ide O.S.R Nos. 17 and 179 published in the Gazette of India, Part-11, Section 3(I) dated 24th Marc,, 1990.